Similar Projects
Phase 1 - Tower Terrace Road W/O Barnsley to Alburnett Road Grading and Drainage
Conception
$4,400,000 est. value
Cedar Rapids, IA 52407

USACE UPRR Culverts CC
Conception
$5,000,000 est. value
Cedar Rapids, IA

Cedar Rapids Flood Risk Management, Reach 3, 12th Avenue SE Road Closure & CRANDIC Railroad Closure
Term Contract
Design
$5,000,000 to $10,000,000 est. value
Cedar Rapids, IA

Saylorville Shoreline Erosion Protection Project
Term Contract
Design
Johnston, IA 50131

Drainage District No. 74 Drainage Improvements
Infrastructure
Bidding
$3,500,000 est. value
Varina, IA

Hardin Co Partial Main Tile Replacement Drainage District 3
Infrastructure
Bidding
$450,000 est. value
Webster City, IA

Fort Randall-Sioux City 230-Kv Transmission Line, Structure 103/4, Access Ramp and Tower Erosion Repair, IA
Term Contract
Post-Bid
$250,000 to $500,000 est. value
Sioux City, IA

Louisa Co Odessa Wildlife Unit Flood Damage Repairs
Infrastructure
Post-Bid
$100,000 est. value
IA

Jesup Drainage Ditch
Results
$153,885 est. value
Jesup, IA

Jesup CSD Drainage Improvements
Results
$86,500 est. value
Jesup, IA 50648

USACE McLoud Run LWR CC
Conception
$2,500,000 est. value
Cedar Rapids, IA

Cedar Rapids Flood Risk Management Project
Term Contract
Design
$10,000,000 est. value
Cedar Rapids, IA

Franklin Co Partial Main Tile Replacement Drainage District
Infrastructure
Bidding
$125,500 est. value
Hampton, IA

Wanatee Tributary Restoration
Infrastructure
Post-Bid
$147,000 est. value
Marion, IA

Cedar Lane Culvert Replacements
Results
$431,000 est. value
Waverly, IA

Last Updated 02/18/2022 07:56 AM
Project Title

Silver Creek Stabilization

Physical Address View project details and contacts
City, State (County) Davenport, IA   (Scott County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This is a stream bank stabilization and prairie reconstruction project. Approximately 1,000 LF on the West Branch of Silver Creek, just west of Wisconsin will be stabilized through excavation and rock riffle installation. There will be an existing culvert extension and a new culvert installation. HMA access and driveway areas are also included. Approximately 18 acres of ag land will be converted into native prairie; grading for access paths/firebreaks will occur in the prairie area prior to seeding. There is an alternate for the seeding work and an alternate for the seeing work and three years of maintenance.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents