Similar Projects
Warner Park Community & Recreation Center Expansion
Infrastructure
Sub-Bidding
$2,000,000 CJ est. value
Madison, WI 53715

Senior Center
Alteration
Post-Bid
Jefferson, WI 53549

Ballistic Shutters
Alteration
Post-Bid
Milwaukee, WI 53210

The Tower Heritage Center Basement Waterproofing
Results
West Bend, WI 53095

Corridor Ceiling and Lighting Upgrade - Pulaski High School
Alteration
Results
Milwaukee, WI 53215

Mechanical Lab Wall Placement
Alteration
Post-Bid
Green Bay, WI

Building 3.1 Bid Package Flooring and Gypsum Board Assembly
Alteration
Results
Milwaukee, WI

Demountable Walls
Term Contract
Post-Bid
Madison, WI

Greenquist Hall Lab Fire Door Replacement - GPC
Alteration
Results
$620,000 est. value
Kenosha, WI 53144

Industrial Lab Cabinetry
Alteration
Post-Bid
Wausau, WI

Gym Divider Curtain at Milwaukee Marshall High School
Alteration
Results
$29,000 est. value
Milwaukee, WI 53216

Ceiling Tiles and Ceiling Support Systems
Term Contract
Post-Bid
Madison, WI

Downtown Milwaukee Campus(DMC) - Student Center Atrium Improvements
Alteration
Results
$300,000 est. value
Milwaukee, WI 53233

Nature Center Welcome Counter
Alteration
Post-Bid
Green Bay, WI 54302

Perimeter Wall Repairs - Waupun Correctional Institution
Renovation
Results
$158,900 CJ est. value
Waupun, WI 53963

Last Updated 07/20/2023 03:17 PM
Project Title

Fire Department Bathroom Renovation

Physical Address View project details and contacts
City, State (County) Monona, WI 53716   (Dane County)
Category(s) Single Trades
Sub-Category(s) Finishes/Interior
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The City of Monona reserves the right to reject any or all Bids. This project consists of repairs to a partially collapsed sanitary line coming from the Men’s Bathroom in the Monona Fire Department. To properly replace the line the CONTRACTOR will be required to cut it out of the floor slab from behind a concrete block wall. This project also includes removals of 2 basin sinks, 2 urinals, and 2 toilets with stalls. Removal of ceramic tile, light fixtures, mirrors, and some plumbing will also be required. These items will be replaced with all the necessary plumbing needed for 1 urinal, 1 toilet (ADA compliant with stall), 1 basin sink with counter, mirrors, and vanity. 5 new ceiling mounted (flush or recessed) LED lights will also be installed. A new steel stud and drywall wall will need to be built, furring out a concrete masonry wall to replumb a new sink and hang a new vanity. CONTRACTOR will need to reinstall dispensers to meet ADA compliance (existing soap, toilet paper, and paper towel dispensers to be reused), while also hanging a new mirror, and paint old door to shower room. Repainting the shower room trim/framing and the rest of the bathroom walls is also required. This project also includes the expansion of the entryway door/frame for ADA compliance as well as replacement of epoxy flooring in the hallway adjacent the bathroom. There are 2 existing touchless sensors for the urinals, 1 of which needs to be reused the other the City will keep. All other materials necessary to perform this work are to be provided by the CONTRACTOR. Any and all other services as it pertains to the successful installation of the above-listed items are the CONTRACTOR.

Details

Division 09 - Finishes.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents