Similar Projects
Sachuest Point National Wildlife Refuge (NWR) Rehabilitation Water Well
Infrastructure
Post-Bid
$100,000 CJ est. value
Middletown, RI 02842

Construction and Installation of Improvements to the Existing Public Water Supply System Serving Hog Island Water Association - South End Community
Infrastructure
Post-Bid
$200,000 CJ est. value
Portsmouth, RI 02871

RFP D/B - NOAA OMAO Ship and Support Facility Relocation, Naval Station Newport
New Construction, Infrastructure - 22,129 SF
Post-Bid
$250,000,000 CJ est. value
Newport, RI 02841

Create an On-Call List of Master Plumbers for Residential Plumbing Services
Term Contract, Alteration
Post-Bid
Providence, RI

Plumbing Services
Term Contract
Post-Bid
Smithfield, RI

Bucklin Point WWTF Final Clarifier, UV Disinfection and Other Miscellaneous Improvements
Renovation
Results
$70,834,000 CJ est. value
Providence, RI 02903

Plumbing Services
Term Contract
Post-Bid
North Smithfield, RI 02896

Various Water Pipe Appurtenances With 1- Option Year
Term Contract
Post-Bid
Providence, RI 02903

Plumbing Supplies
Term Contract
Post-Bid
Providence, RI 02903

Artisan-Plumbing and Heating
Term Contract, Alteration
Post-Bid
$60,000 est. value
Westerly, RI

Artisan- Plumbing Maintenance and Repair Services
Term Contract
Post-Bid
Westerly, RI 02891

Water Main Replacement
Infrastructure
Post-Bid
$1,500,000 CJ est. value
North Kingstown, RI 02852

Last Updated 09/21/2023 05:11 AM
Project Title

2023 Water Main Project

Physical Address View project details and contacts
City, State (County) Tiverton, RI 02878   (Newport County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Results, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $579,972 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Reference Number 0000324151 In general, the project includes but is not limited to, the replacement of 1200 Linear Feet (LF) of 6-inch Asbestos Concrete (AC) pipe with 8-inch diameter class 52 cement lined ductile iron pipe on Haskins Ave, Tiverton, RI. AC Pipe to be removed and properly disposed. This includes the installation of all services, main to curbstop. Option 1: In general, the project includes but is not limited to, the replacement of 430 Linear Feet (LF) of 4-inch Cast Iron (CI) pipe with 6-inch diameter class 52 cement lined ductile iron pipe on Bayview Ave, Tiverton, RI. This includes the installation of all services, main to curbstop. Option 2: In general, the project includes but is not limited to, the replacement of 400 Linear Feet (LF) of 6-inch Cast Iron (CI) pipe with 6-inch diameter class 52 cement lined ductile iron pipe on Terrace Ave, Tiverton, RI. This includes the installation of all services, main to curbstop. Option 3: In general, the project includes but is not limited to, the replacement of 480 Linear Feet (LF) of 6-inch Cast Iron (CI) pipe with 6-inch diameter class 52 cement lined ductile iron pipe on Ocean View Ave, Tiverton, RI. This includes the installation of all services, main to curbstop. Temporary water bypass piping is required for Bayview Ave., Terrace Ave., and Ocean View Ave. to perform the base work on Haskins Ave. Options will be awarded at the time of the base contract award. Question Acceptance Deadline 07/20/2023 02:00 PM EDT Questions are submitted online Yes General Requirements - Certified Payroll - Contractors License Required - Insurance Required - Prevailing Wage Required

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents