Similar Projects
Walnut Street /Chestnut Street /Central Street Oval Improvements - City of Nashua
Infrastructure
Conception
$501,422 est. value
Nashua, NH

East Hollis Street Intersection Improvements - City of Nashua
Infrastructure
Conception
Nashua, NH 03060

UNH Field House West Lot Parking Lot Site Improvements
Infrastructure
Bidding
$200,000 est. value
Durham, NH 03824

Driveway Sealing and Striping
Post-Bid
Madison, NH 03849

Acquisition and Development of Pearl Street Parking Lot
Infrastructure
Post-Bid
Manchester, NH 03104

Whittier Street Sidewalk Improvements
Results
Dover, NH

Cheshire Rail Trail III Loop Project
Results
Less than $306,636 est. value
Keene, NH

Keene Housing Site Improvements - Multiple Locations
Renovation
Construction
Keene, NH

Factory Street Sidewalks ADA Parking & Drainage (Water Street to Main Street)
Infrastructure
Conception
$450,000 est. value
Nashua, NH 03060

Acquisition and Development of Hartnett Parking Lot
Infrastructure
Post-Bid
Manchester, NH

Wason Pond Community Center Ramp
Results
Chester, NH 03036

Ledge Street at Nashua Canal Sidewalk and Guardrail - City of Nashua
Infrastructure
Conception
$650,000 est. value
Nashua, NH

New Hampshire Farm Museum Parking Lot
Alteration
Post-Bid
Milton, NH 03851

2021 Sidewalk Improvements
Term Contract
Results
Dover, NH

Police Station Parking Lot Expansion
Infrastructure
Post-Bid
Lebanon, NH 03766

Reported 06/17/2022 12:00 AM
Project Title

Removal of the Exit 10 NB Off and SB on Ramp Tolls Off the F.E. Everett Turnpike

Physical Address View project details and contacts
City, State (County) Merrimack, NH   (Hillsborough County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The State of New Hampshire is soliciting bids for: Removal of the Exit 10 NB off and SB on ramp tolls off the F.E. Everett Turnpike in Merrimack.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents