Similar Projects
Rebid Sheriff Reservoir Outlet Works Gate Replacement
Infrastructure
Design
$470,064 CJ est. value
Oak Creek, CO 80467

Tenmile Intake Structure, Pipeline and Erosion Mitigation Improvements
Infrastructure
Post-Bid
Frisco, CO

Reinforced Concrete Pipe
Term Contract, Infrastructure
Post-Bid
Fort Collins, CO

Root & Ratliff Salinity Control Pipeline Project
Results
$2,350,000 to $2,850,000 est. value
Mancos, CO

Addenbrooke Park Pond Renovations
Results
Lakewood, CO

Root & Ratliff Salinity Control Pipeline Project
Infrastructure
Post-Bid
Mancos, CO

Jordan Road Underpass
Results
Less than $327,480 est. value
Parker, CO 80134

Detention Ponds Improvement Project
Infrastructure
Post-Bid
$550,000 to $600,000 est. value
Golden, CO

Y--Florida Ditch and Canal Lining
Results
$1,000,000 to $5,000,000 est. value
Durango, CO

High Point PD1 Pond Project
Infrastructure
Post-Bid
Denver, CO

Wilson Mesa at Telluride Metropolitan District Augmentation Pond Project
Results
Telluride, CO 81435

48th Avenue Grading Project
Infrastructure
Post-Bid
Aurora, CO

East Mesa Ditch Culvert Replacement
Results
Aspen, CO

Red Sandstone Creek Culvert Replacement
Term Contract
Post-Bid
Vail, CO

Retaining Wall Installation Project
Results
Less than $100,000 est. value
CO

Last Updated 12/08/2022 02:03 PM
Project Title

Victor Reservoir #2 Outlet Modifications

Physical Address View project details and contacts
City, State (County) Victor, CO 80860   (Teller County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Shoreline/Erosion/Drainage, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected June 2022
Bids Due View project details and contacts
Estimated Value $609,724 [brand] Estimate
Plans Available from Civil Engineer - 12/22/21
Owner View project details and contacts
Architect View project details and contacts
Description

As of December 8, 2022, the project is pending award. A timeline for award has not been confirmed. The last day for submission of questions will be January 21, 2022 and the last addendum will be issued by January 25, 2022. Work to be performed generally includes: Removal of existing outlet tower, construction of a concrete grade beam, construction of a intake structure including gate installation, installation of downstream access manhole on 12" water supply line, replacement of valves at 12" bypass, rehabilitation of the existing outlet conduits with CIPP liner (if necessary), and all ancillary work to complete the work described here-in. Post performance and payment bonds; and deliver the material and equipment in conformance with specifications within the contract time. Instrumentation for the bubbler system shall be Owner furnished and installed. Any questions concerning this bid shall be directed to Doug Schwenke with JDS-Hydro Consultants (719)227-0072 or dschwenke@jdshydro.com

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents