Similar Projects
Beale Street Streetscape and Improvements project
Infrastructure
Bidding
$7,000,000 est. value
Kingman, AZ 86401

Topock - Kingman Highway (I 40) (Ca Border - Mp 2.54)
Infrastructure
Bidding
$3,000,000 est. value
Kingman, AZ 86409

WAPA (DSW Region) General Site Work/Concrete Construction MATOC
Post-Bid

City-Wide Paving Project
Infrastructure
Post-Bid
Bullhead City, AZ 86442

Safety Improvements
Results
Less than $640,000 est. value
Kingman, AZ 86411

Fort Mohave Penetrate and Chip Seal
Results
$149,749 est. value
Kingman, AZ

Quartzsite - Parker - Topock Hwy (SR 95) (Riverside Dr - Bill Will. Rive)
Infrastructure
Bidding
$2,500,000 est. value
Lake Havasu City, AZ 86405

Secret Pass Wash at SR95 Box Culvert Extension and Access Road
Infrastructure
Post-Bid
$1,627,191 est. value
Bullhead City, AZ 86429

Apache Road Improvements South Phase
Results
Kingman, AZ

Dilkon Road Improvement
Infrastructure
Bidding
$2,000,000 est. value
Golden Valley, AZ 86413

Apache Road Improvements North Phase
Results
Kingman, AZ 86413

Brooks Boulevard Millings
Results
Kingman, AZ

Shinarump Road Phase II
Results
Kingman, AZ

Kingman Industrial Park Roadway Improvements
Infrastructure
Results
Kingman, AZ

Construct Fsr 4 Road Project - Tonto National Forest
Infrastructure
Results
$100,000 to $250,000 est. value
Rio Verde, AZ 85263

Reported 06/15/2022 12:53 PM
Project Title

(1-11 Project) Airway Avenue - Prospector Street to Rancho Parkway and (1-11 Project) Rancho Santa Fe Parkway TI Phase 1

Physical Address View project details and contacts
City, State (County) Kingman, AZ   (Mohave County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Design Development, Construction Start Expected December 2022
Bids Due View project details and contacts
Estimated Value $5,655,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work for a road / highway in Kingman, Arizona. Design plans call for site work for a road / highway. (1-11 Project) Airway Avenue - Prospector Street to Rancho Parkway This project will extend Airway Avenue between Prospector Street and Rancho Santa Fe Parkway, proving access to the east Kingman area. The estimate is for a two lane rad with center median. As of June 14, 2022 this project is currently in the FY 2022-2026 CIP . Funding for this project is allotted in the city's capital improvement plan for Fiscal Year 2022. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2022.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents