Similar Projects
Air Conditioning and Quality Improvements Package 5 - 2022 Bond - Lansing School
Alteration
Design
$4,100,000 est. value
Lansing, MI 48933

Air Compressor and Installation
Renovation
Sub-Bidding
$650,000 CJ est. value
Bay City, MI 48708

JBB Marquette Branch Prison - Kitchen Cooler - Freezer
Renovation
Sub-Bidding
$125,000 CJ est. value
Marquette, MI 49855

Horizontal Unit Ventilator
Alteration
Post-Bid
Clio, MI 48420

Clio High School Area F Air Conditioning Renovation
Alteration
Post-Bid
Clio, MI

Upgrade to Potable Water Risers Construction
Alteration
Results
$1,000,000 to $5,000,000 est. value
Iron Mountain, MI 49801

HVAC Renovations - Air Conditioning
Alteration
Results
Alma, MI 48801

Pool Dehumidification AHU Replacement
Renovation
Pending Verification
$2,200,000 CJ est. value
Allegan, MI 49010

HVAC for Bus Wash Project
Alteration
Post-Bid
Clinton, MI

IT Room HVAC Upgrades
Alteration
Results
Warren, MI 48089

Fire Station Duct Cleanings
Alteration
Post-Bid
Clinton Township, MI 48038

Air Filters
Alteration
Results
Sterling Heights, MI

Will Carleton Academy Modular Classroom HVAC Updates
Alteration
Post-Bid
$200,000 est. value
Hillsdale, MI 49242

2022 Ventilation Equipment Package
Alteration
Results
Warren, MI 48089

HVAC Improvements
Alteration
Post-Bid
$380,000 est. value
Leslie, MI 49251

Last Updated 09/06/2023 02:06 AM
Project Title

Valley View/ Coburn Boiler Replacement Project

Physical Address View project details and contacts
City, State (County) Battle Creek, MI 49017   (Calhoun County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $250,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Valley View-coburn Schools Boiler Replacement Bid(5%), Performance(100%), Payment(100%), Certified Check All services are to be completed by 11/01/2023 Bidders are strongly encouraged to personally inspect the existing site conditions at the pre-bid meeting and prior to bid submission to become thoroughly acquainted with the requirements of this bid. The District will not accept responsibility for a bidder's failure to inspect the facilities/sites. Question Deadline 09/07/2023 at 10:00 AM ET Refer to Project Manual for Project Scope These projects will be bid separately per location. Following the bid opening, the district will decide whether or not it is financially feasible to complete the proposed projects at both locations. All methods should be included in the base bids. It is the responsibility of the contractor to develop means to remove and install boilers at the proposed locations. i. Please ensure you have developed (and included) ancillary costs such as additional roof and/or carpentry work that may need completed for complete removal/ installation. ii. All roofing at the Valley View location is currently under warranty through WTI/Tremco and all flashing and repairs must be made through a certified technician to maintain those warranties. iii. All areas must be restored to pre-existing conditions upon project completion

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents