Similar Projects
Cottonwood Drive/Lanceleaf Street Traffic Signal - Town of Parker
Infrastructure
Conception
$600,000 CJ est. value
Parker, CO 80134

Cottonwood Drive/Lanceleaf Street Traffic Signal - Town of Parker
Infrastructure
Conception
$600,000 CJ est. value
Parker, CO 80134

Life Time Athletic Resort / Castle Pines
New Construction, Infrastructure - 115,000 SF
Design
$30,000,000 CJ est. value
Castle Pines, CO 80108

Life Time Athletic Resort / Castle Pines
New Construction, Infrastructure - 115,000 SF
Design
$30,000,000 CJ est. value
Castle Pines, CO 80108

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Mainstreet and Twenty Mile Road Intersection Improvements
Infrastructure
Post-Bid
CO 80138

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Asphalt Mill and Overlay of Two Middle School Tracks
Infrastructure
Results
Littleton, Parker, CO 80130

Castle Pines Village Infrastructure
Infrastructure
Pending Verification
$4,000,000 CJ est. value
Castle Rock, CO 80108

Tall Tales Ranch / Lone Tree
New Construction, Infrastructure
Pending Verification
$5,400,000 CJ est. value
Parker, CO 80134

Lincoln Avenue Widening - Keystone to Parker Road - Town of Parker
Infrastructure
Conception
$21,000,000 CJ est. value
Parker, CO 80134

Millers Landing Hotel
New Construction, Infrastructure
Design
$89,500,000 CJ est. value
Castle Rock, CO 80104

RFQ Contractor - General Contractors
Infrastructure, Renovation
Post-Bid
$3,000,000 CJ est. value
Castle Rock, CO 80104

Road Paving Project
Infrastructure
Results
CO

Ridgegate Southwest Village
New Construction, Infrastructure
Pending Verification
$440,000,000 CJ est. value
Lone Tree, CO 80134

Last Updated 05/15/2023 07:35 AM
Project Title

Bayou Gulch Road (Pradera Parkway to Scott Avenue) Project

Physical Address View project details and contacts
City, State (County) Castle Rock, CO 80134   (Douglas County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $3,717,355 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Reference Number 0000317219 This project consists of improvements to Bayou Gulch Road from Pradera Parkway to Scott Avenue. The improved configuration will include realignment and reconstruction of a single driving lane with shoulders in each northbound and southbound directions, construction of an embankment, extension of a concrete box culvert and a new urban storm sewer system. Bid items include removal of sidewalk, asphalt and curb and gutter, hot mix asphalt, soil retention blanket, trench drain, extension of box culvert, installation of storm water system, and traffic control. The Project includes the following major items and approximate quantities: 90,290 cubic yards embankment replacement 3391 tons hot mix asphalt 1707 linear feet reinforced concrete pipe (complete in place) 5114 linear feet curb and gutter 810 square yards concrete sidewalk General Requirements - Bidder Prequalification/Preregistration Required - Bid Deposit Required - Insurance Required - Warranty Information Required Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Payment Bond 100 % Question Deadline 05/02/2023 at 12:00 PM MT Questions are submitted online No

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents