Similar Projects
Resuse System Phase 2 Transmission Line
Bidding
Clovis, NM

ASL Asphalt Entrance Rebuild
Bidding
Albuquerque, NM 87196

Wastewater System Improvements 2019
Post-Bid
Hagerman, NM 88232

Residential Streets Rehabilitation 2018B
Post-Bid
Albuquerque, NM 87102

Arroyo Repairs Owen Rd
Results
$500,000 to $1,000,000 est. value
NM

Chamberino Mutual Domestic Water Consumer and Sewer Association Water System Improvements Project
Results
Anthony, NM 88021

Asphalt Millings Stockpile Crushing Project
Bidding
Raton, NM

Water System Valve Replacement
Post-Bid
Roswell, NM 88201

Y--Organ Mountain Pavement Fog Seal
Results
$450,000 to $650,000 est. value
Dona Ana, NM

Whittier Street Byron Avenue Reconstruction
Alteration
Bidding
Raton, NM 87740

Sunland Park Street Paving and Sidewalk Construction On-Call
Post-Bid
Sunland Park, NM 88063

Reconstruct Arnold Avenue Cannon AFB
Results
$500,000 to $1,000,000 est. value
Clovis, NM 88101

Seventh Street and Thornton Street Intersection Reconstruction
Infrastructure
Bidding
Clovis, NM

Wastewater and Water System Improvements Project
Post-Bid
Cimarron, NM 87714

La Union - Water System Improvement
Results
La Union, NM

Last Updated 05/14/2021 10:46 AM
Project Title

North Mesa Road And Utility Improvements Project - Casa De Oro

Physical Address View project details and contacts
City, State (County) Los Alamos, NM 87544   (Los Alamos County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Fuel/Chemical Tanks and Lines, Paving/Reconstruction, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $3,087,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Correct deficiencies identified in the geotechnical and pavement condition reports, including removing and replacing the asphalt surface (“Process, Place & Compact” – recycling method to process existing asphalt and base material and re-compact for a strong base), install 3 inches of new asphalt pavement. Remove and replace targeted concrete infrastructure (curb, gutters, sidewalk, driveways and ADA curb ramps to improve drainage and ADA accessibility). Install street light conduit. Replace gas and water system: 8” Waterlines and 2” & 4” gas lines in the roads, all new gas and water service laterals, and 2 Pressure Reducing Valve Replacements. Budget breakdown: Roadway Budget – $1,687,000, Utility CIP Budget – $1,400,000, Total Budget - $3,087,000.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings, Fences and Gates.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Drainage Structures, Fuel Distribution Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents