Similar Projects
RiNo Art District
Renovation
Conception
Denver, CO 80205

Watershed
New Construction, Build-Out - 180,000 SF
Design
$72,000,000 est. value
Denver, CO 80216

Harvard Gulch West Trail (Elevate Denver Bond)
Design
Denver, CO

RHS Track Resurfacing
New Construction
Bidding
Rifle, CO 81650

2021 Playground Replacement
New Construction
Bidding
Broomfield, CO 80234

Estes Park Campground Playgrounds Design, Procure and Install Playground Equipment and Fall Zone Material
Post-Bid
Estes Park, CO 80511

Stone Canyon Challenge Course Development
Post-Bid
Larkspur, CO 80118

Trail Head Park for City of Ft Collins
Results
Fort Collins, CO 80524

Foxridge Park Improvements
Results
Less than $240,000 est. value
Centennial, CO 80122

Basalt River Park - Phase I & II
New Construction - 14,500 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Basalt, CO 81621

Design/Build Services for Tennis Courts
Construction
Colorado Springs, CO 80920

Springs at Pena Station
New Construction
Pending Verification
Denver, CO 80249

Fisher Farm Subdivision
New Construction
Pending Verification
Timnath, CO 80731

Copper Steppe at Greeley Mall
New Construction
Design
$13,600,000 est. value
Greeley, CO 80634

Highland Lake Park Project
New Construction
Bidding
Mead, CO

Last Updated 06/15/2021 02:16 PM
Project Title

Panorama Park Construction

Physical Address View project details and contacts
City, State (County) Colorado Springs, CO   (El Paso County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value Less than $5,100,990
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This report includes the hydrologic and hydraulic design analyses for the Panorama Park project. Project improvements generally consist of renovating the existing park to incorporate improved outdoor recreation and create a neighborhood amenity. In accordance with Colorado Springs development criteria, a full-spectrum detention basin will be constructed within the southwest portion of the site to provide both water quality treatment and stormwater discharge attenuation. The detention basin will capture the site’s stormwater runoff and discharge towards the Sand Creek – Peterson Field tributary at the southeast corner of the site. Additional design practices such as minimizing directly connected impervious areas and sheet flow dispersion of stormwater runoff were utilized in the design.

Details

Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents