Similar Projects
Stop Log Replacement
Infrastructure
Design
$250,000 CJ est. value
Thomaston, CT 06787

Reclain and Repave
Infrastructure
Bidding
$200,000 CJ est. value
Bethlehem, CT 06751

Pavement Marking 2022
Infrastructure
Bidding
$75,000 CJ est. value
New Milford, CT 06776

Traffic Signal LED Relamping at Various Locations
Infrastructure
Sub-Bidding
$2,500,000 CJ est. value
Thomaston, CT 06787

Drainage Pipe
Infrastructure
Post-Bid
New Milford, CT

Advanced Metering Installation Services
Infrastructure
Post-Bid
Watertown, CT

Water Main Replacement Case, Center and Holabird Areas
Infrastructure
Results
Winchester, CT

Drainage Pipe Request for Quotes Winter 2022
Infrastructure
Results
New Milford, CT

Starbucks - East Main Street / Torrington
New Construction, Infrastructure - 2,100 SF
Pending Verification
$650,000 CJ est. value
Torrington, CT 06790

High Friction Surface Treatments on Curves on State Roads Various Towns
Infrastructure
Bidding
$2,500,000 CJ est. value
Thomaston, CT 06787

Civil and Paving Multiple Award Construction Contract
Term Contract
Post-Bid
$500,000 CJ est. value
Jacksonville, NC 28547

Runway 6/15 - Off Airport Obstruction Removal Bradley International Airport
Infrastructure
Results
$1,891,750 CJ est. value
Windsor Locks, CT 06096

New Middle School/High School and Central Administrative Office - Phase 2 Bid Package
New Construction, Infrastructure - 309,000 SF
Bidding
$85,000,000 CJ est. value
Torrington, CT 06790

Rehabilitation of Bogue Road Over the Naugatuck River CTDOT Bridge
Infrastructure
Post-Bid
$3,000,000 CJ est. value
Torrington, CT 06791

Swendsen Farm Preserve Observation Bridge, Boardwalks & Ravine Trail Walkway
Infrastructure
Results
$29,177 CJ est. value
Bethlehem, CT 06751

Last Updated 08/04/2022 03:14 PM
Project Title

Camp Dutton Road Drainage

Physical Address View project details and contacts
City, State (County) Litchfield, CT 06759   (Litchfield County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of August 04, 2022, project was awarded to Towne & Aurell Inc. Awarded amount was not disclosed. The Town of Litchfield is accepting bids for Drainage work on Camp Dutton Road. All bids must be submitted on forms and in accordance with specifications supplied by the Town of Litchfield, Public Works Department, 101 Russell Street, Litchfield CT Any questions pertaining to the scope of the work or content or procedure for submitting proposals should be directed to Raz Alexe, Director of Public Works by e-mail to be received no later than June 13, 2022. Any questions received after that date will not be answered. Contact information is as follows: Raz Alexe, Director of Public Works ralexe@townoflitchfield.org The Town of Litchfield is requesting bid proposals for the time period beginning June 23, 2022. The Town of Litchfield reserves the right to negotiate with the Contractor selected, additional periods beyond June 23, 2022 if deemed to be in the best interest of the Town. The Town reserves the right to reject any and all bids for any reason the Town deems advisable, and to award contract or contracts to any Contractors bidding on the work, regardless of the amount of bid

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents