Similar Projects
Electrical, Framing, Mechanical, Flooring,Plumbing, Drywall
Alteration
Design
San Francisco, CA 94128

Folsom Hydraulic Cylinder Replacement (HCR)
Infrastructure
Bidding
$25,000,000 CJ est. value
Folsom, CA 95630

Sycamore Sewer Trunk Replacement Project
Infrastructure
Bidding
$12,400,000 CJ est. value
Hercules, CA 94547

Gas Detection System Refurbishment
Infrastructure
Sub-Bidding
$100,000 CJ est. value
Oceanside, CA 92054

Job Order Contracts - Plumbing Contracting Services
Term Contract
Sub-Bidding
$2,000,000 CJ est. value
Redwood City, CA 94063

Modular Classroom Restroom Addition At Haynes Elementary School
Renovation
Post-Bid
Ontario, CA 91762

Building D 2nd Floor Labs Mechanical System Upgrades
Alteration
Post-Bid
$600,000 est. value
Long Beach, CA 90808

Plumbing Services
Term Contract
Results
$200,000 est. value
San Jose, CA 95128

Plumbing Contractor
Term Contract
Results
Concord, CA

District 22 Trunk Sewers Group 1 Rehabilitation
Infrastructure
Bidding
$4,200,000 CJ est. value
Glendora, CA 91741

Construction Job Order Contracting - General Services Department (Plumbing Construction)
Term Contract
Sub-Bidding
Santa Cruz, CA 95060

Plumbing Services BPA
Term Contract, Alteration
Post-Bid
Edwards, CA

District Wide HVAC Replacements 11 Campuses (COVID) - Plumbing
Alteration
Results
$1,000,000 est. value
Hesperia, CA 92344

Product Water Pump Station Upgrades Project
Renovation
Bidding
$3,200,000 CJ est. value
Santa Barbara, CA 93103

Programmable Logic Controller (PLC) and Primary Effluent Pumping Control Upgrade
Term Contract
Sub-Bidding
Tracy, CA 95376

Last Updated 11/28/2022 06:32 PM
Project Title

Tracks at Brea Western Extension Community Outreach and Concept Design

Physical Address View project details and contacts
City, State (County) Brea, CA 92821   (Orange County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Tracks at Brea Western Extension Community Outreach and Concept Design All questions must be put in writing and must be received by the City via e-mail no later than 4:00 p.m., November 9, 2022 to E-Mail: Wade Whitman, Management Analyst, e-mail address is wadew@cityofbrea.net The proposal shall be submitted via e- mail, including both the scope and fee in one consolidated document in PDF format, entitled: "Tracks at Brea Western Extension (Brea Canyon Flood Control Channel to Berry Street) Community Outreach and Concept Design." Proposals received after the specified time will not be accepted and will be returned to the Offeror via e-mail notification. Project Description: The proposed project will engage community stakeholders to plan a vision for extending the successful Tracks at Brea park setting upon the "Western Extension". While the Western Extension includes secured funding for a 1,300-feet long paved active transportation path, the remaining 120-feet cross-section needs funding for park development. Located west of Brea Canyon Flood Channel, the project will plan for a transition of the abandoned railroad right-of-way into an accessible passive park that restores the natural setting for enjoyment by residents, visitors, and strengthens an ecosystem for the flora and fauna. Through low impact development, educational opportunities, creation of wildlife habitat areas, native plantings, stormwater and water quality management components, the project will provide public, water, conservation, and ecological benefits. The proposed project will work with community members and interested stakeholders to develop concepts, evaluate permitting needs, and identify next steps to implementation of the new green infrastructure area. Refer to Attachment 2 showing a draft concept for the park that will be comprehensively refined and updated based on community engagement, existing conditions review, and constraints analysis

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents