Similar Projects
Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

Lammers Road Resurfacing
Infrastructure
Bidding
$200,000 est. value
Tracy, CA 95377

Arbour Drive, Bond Way, Moreland Street and Treasure Avenue Resurfacing
Infrastructure
Bidding
$522,000 to $639,000 est. value
Stockton, CA 95214

A and E On-Call Roadway Construction,District 10
Infrastructure
Post-Bid
$6,425,530 to $10,441,487 est. value

Street Resurfacing On Federal-Aid Streets Fy2020-21
Alteration
Post-Bid
$2,618,546 est. value
Stockton, CA 95206

Brennan Avenue Resurfacing
Infrastructure
Results
$1,140,000 to $1,395,000 est. value
Escalon, CA

South 99 Frontage Road (East) Resurfacing
Infrastructure
Results
$570,000 to $670,000 est. value
Stockton, CA

Tracy Various Paving
Term Contract, Alteration
Post-Bid
$1,000,000 to $5,000,000 est. value
Tracy, CA 95304

Road Diet On North Eldorado Street, Turn And Bike Lanes
Infrastructure
Results
Stockton, CA 95214

Manila Highway 255 Shared Use Path
Alteration
Post-Bid
$888,055 est. value

Concrete Repairs and Resurfacing
Infrastructure
Results
Stockton, CA

SB Minor B Widen Existing Staa Curve Radius
Infrastructure
Post-Bid
$158,000 est. value
Stockton, CA

2021 Pavement Rehabilitation Program Project
Infrastructure
Results
$420,000 est. value
Stockton, CA 95207

Cold Plane and HMA Overlay
Infrastructure
Post-Bid
$3,380,000 est. value
CA

West Lane Resurfacing
Infrastructure
Results
Lodi, CA

Last Updated 06/16/2022 12:30 AM
Project Title

2022 Paving Projects Phase Three

Physical Address View project details and contacts
City, State (County) Lodi, Stockton, CA 95209   (San Joaquin County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Removal and replacing of existing AC Paving, aggregate base material, and miscellaneous concrete curb and gutter at the existing parking lots. Install new AC Paving, aggregate base material, curb and gutters at new additional parking lot areas, and additional parking lot lighting. At John Muir Elementary School, 2303 Whistler Way, Stockton, CA 95209 and then move to Ellerth E. Larson Elementary School, 2375 Giannoni Way, Lodi, CA 95242. Goal DVBE - 3%.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents