Similar Projects
Milton STP BP16(10) (US Route. 7 Gap Project)
Results
$970,995 est. value
Essex Junction, VT

Vermont Route 7 Milton Streetscape Project - South
Results
$324,720 est. value
Milton, VT

Mt. Philo Summit Trail Reconstruction
Results
Charlotte, VT

CY-20 Sidewalk Program
Results
$900,000 to $1,200,000 est. value
Burlington, VT

Sidewalk Replacement Charlotte Central School and Shelburne Community School
Results
$97,700 est. value
Charlotte, Shelburne, VT 05445

Jericho STP BP15(10)
Results
$342,906 est. value
Jericho, VT 05465

2020 Sidewalk Spot Repairs
Results
Colchester, VT

TAP TA15(4) - Sidewalk
Results
Essex, VT

Trail Construction Adjacent to State Park Road
Results
Charlotte, VT

Hinesburg Community School Parking and Sidewalk Improvements
Results
Hinesburg, VT 05461

Cherry Street Sidewalk STP SDWK(18)
Results
Less than $300,000 est. value
Milton, VT

Burlington Greenway Construction Phase 3B North: Blanchard Beach to Proctor Place
Results
$100,000 to $300,000 est. value
Burlington, VT

CEATS Building 119 Parking Improvements
Results
Jericho, VT 05465

Colchester-Essex NH 030-1 (34)
Results
$1,000,000 to $2,500,000 est. value
Colchester, Essex, VT 05439

Underhill STP BP13(5) Park Street and VT Route 15 Sidewalk
Results
$250,000 to $500,000 est. value
Underhill, VT 05489

Last Updated 03/04/2021 12:13 PM
Project Title

Blair Park Sidewalk Project - Williston STP BP17(12)

Physical Address View project details and contacts
City, State (County) Williston, VT   (Chittenden County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value Less than $250,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Beginning at a point on Blair Park Road in the Town of Williston, at US Route 2 (Williston Road) and includes multiple segments of sidewalk along Blair Park Road in the Blair Park subdivision. Work to be performed under this project includes: Construction of two separate sections of 5-foot wide concrete sidewalk, new raised crosswalk, adding raised crosswalks to existing crosswalks, and related items. The Contract shall be completed on or before October 8, 2021

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents