Similar Projects
Eastside Replace Above Ground Unleaded Fuel Tank - CS-VOT-19 - County of Volusia
Demolition, Infrastructure
Conception
$365,000 CJ est. value
South Daytona, FL 32119

Public Utilities Field Operations Facility
New Construction
Design
Port Orange, FL

Field Operations Facility - City of Port Orange
New Construction, Infrastructure - 28,072 SF
Design
$10,400,000 CJ est. value
Port Orange, FL 32129

Thomas C. Kelly 1st Floor Restroom Remodel
Build-out
Bidding
$225,000 CJ est. value
Deland, FL 32720

Beach Safety Sunsplash Lifeguard Tower
New Construction, Renovation, Infrastructure
Bidding
$350,000 CJ est. value
Daytona Beach, FL 32118

Construction Management at Risk Services
Renovation, Term Contract
Post-Bid
Ormond Beach, FL

West Volusia Transfer Station Entrance Improvements and New Truck Scale
Renovation
Post-Bid
$1,200,000 CJ est. value
Deland, FL 32724

Construction Services Performed on AJW-242 Unstaffed Infrastructure Sustainment (UIS) Facilities On and Off Airport Operating Areas
Results
Less than $150,000,000 est. value

IDIQ Multiple Award Task Order Contracts for Horizontal Construction, Renovation, Repair, and Incidental Design In Alabama, Florida, Mississippi, and Georgia
New Construction, Renovation
Results
$100,000 to $250,000 est. value

Professional Solid Waste Management Engineering Services
Renovation, Infrastructure
Pending Verification
$200,000 CJ est. value
Deland, FL 32720

RFQ - Professional Construction Management/General Contracting Services for New Doris Leaper Doan Parcel Park
Demolition, New Construction, Infrastructure
Bidding
$2,000,000 CJ est. value
Deland, FL 32720

Public Utilities Field Operations Facility - City of Port Orange
New Construction, Infrastructure
Post-Bid
$6,000,000 CJ est. value
Port Orange, FL 32127

CFX Systemwide Facilities Maintenance Services
Renovation, Term Contract, Alteration
Results

Utility Administration Center - City of Deland
New Construction, Infrastructure
Post-Bid
$5,000,000 CJ est. value
Deland, FL 32724

Design-Build of Public Works Building
New Construction - 2,400 SF
Results
Holly Hill, FL 32117

Last Updated 09/12/2023 03:33 PM
Project Title

Community Redevelopment Update

Physical Address View project details and contacts
City, State (County) Holly Hill, FL 32117   (Volusia County)
Category(s) Government/Public
Sub-Category(s) Misc. Buildings
Contracting Method Competitive Bids
Project Status Construction start expected November 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Online Submissions No Piggyback Solicitation No Bid Bond Required No Performance Bond Required No The City of Holly Hill has an existing CRA Plan which covers the CRA District within the City which expires May 28, 2026. The focus of the Plan Update will include the entire CRA District and will include a particular focus on the Pictona/Ridgewood Avenue and LPGA corridors. The Community Redevelopment Plan is the enabling document which encompasses all the elements which may be undertaken to remove slum and blight and revitalize the Community Redevelopment District. This Plan will be realized through the collaboration of the residents of Holly Hill, business and property owners, City staff and the City Commission. Question End Date 10/9/2023 2:00 PM Anticipated Award Date 11/14/2023 The method of Contractor Selection has not been Determined at this time.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents