Similar Projects
Curry Street Preservation Project
Infrastructure
Bidding
$375,000 est. value
Carson City, NV 89710

Fifth Street / Carson River Road Right Turn Pocket Project
Infrastructure
Bidding
$185,000 est. value
Carson City, NV 89701

WAPA (DSW Region) General Site Work/Concrete Construction MATOC
Post-Bid

Chip Seal with Fog Seal
Results
$1,550,000 to $1,850,000 est. value

Slurry Seal and Chip Seal
Results
$1,300,000 to $1,550,000 est. value

East Park Street Utility Improvement Project
Infrastructure, Alteration
Bidding
$200,000 est. value
Carson City, NV 89706

2 Inch Overlay
Results
$3,200,000 to $3,850,000 est. value

2022 Parking Lot Pavement Preservation Project
Infrastructure
Bidding
$275,000 est. value
Carson City, NV

Chip Seal
Results
NV

NV Flap 39(1) Kings Canyon Road
Results
$2,000,000 to $5,000,000 est. value
Carson City, NV 89703

Deer Run Road Pavement Preservation Project
Infrastructure
Results
$200,000 est. value
Carson City, NV

Clear Creek Road Pavement Preservation Project
Infrastructure
Results
$110,000 est. value
Carson City, NV

Kings Canyon Road Project
Infrastructure
Results
$133,618 est. value
Carson City, NV

All Season Cold Patch
Infrastructure
Results
Carson City, NV

Thin Bonded Multi-Layer Overlay
Infrastructure
Results
$620,000 to $745,000 est. value

Last Updated 04/22/2022 06:03 AM
Project Title

Asphalt Pathways Maintenance Project

Physical Address View project details and contacts
City, State (County) Carson City, NV   (Carson City County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $76,291
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Asphalt Pathways Maintenance Project consists of crack sealing all cracks Type 1 Slurry Seal, striping within 100 of driveway and intersections or as shown on the corresponding maps, all associated preparation and clean up. The Contractor will be responsible for site safety and protection of public from hazards at all times during construction. Existing infrastructure (signage and striping, driveways, curb and gutter, sidewalk, utilities) will be returned to current or better condition.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents