Similar Projects
Fredonia CSD Capital Outlay Project 21/22
Infrastructure, Alteration
Bidding
Fredonia, NY 14063

Basement Restroom
Renovation, Demolition
Bidding
$50,000 to $500,000 est. value
New York, NY 10036

Recreation Center Multi-Purpose Room Floor
Post-Bid
Beacon, NY 12508

Lancaster Central School District Removal and Replacement of VCT
Post-Bid
Lancaster, NY 14086

Public Works Garage Floor Replacement - Phase 2
Results
Goshen, NY 10924

S--Replace Existing Carpet
Results
Stillwater, NY 12170

SMD Services Installation of V/C Floor Tile in Apartments at Riis Houses and Riis II Houses
Term Contract
Bidding
New York, NY 10009

Remove, Dispose and Install Carpet, Vinyl Tile and Vinyl Tile Base, as-needed
Term Contract
Post-Bid
New City, NY 10956

Fieldstone Middle School Cafeteria Floor Replacement
Results
Garnerville, NY 10923

SMD Services Installation of V/C Floor Tile in Apartment at Astoria Houses
Term Contract
Bidding
Queens, NY 11102

New Flooring
Post-Bid
Rodman, NY 13682

Replace Floor and Sanitary Drains, Building 12 - Orleans CF
Results
$700,000 to $1,500,000 est. value
Albion, NY 14411

SMD Services Installation of V/C Floor Tile in Apartments at Sheepshead Bay Houses and Nostrand Houses
Term Contract
Bidding
Brooklyn, NY 11229

Schenectady County Correctional Facility Flooring Upgrade
Post-Bid
Schenectady, NY

Apparatus Floor Replacement at Chester Heights Fire House
Results
Bronxville, NY 10708

Reported 02/02/2022 12:00 AM
Project Title

Park Hall Health and Wellness Office Flooring Replacement at SUNY Oswego

Physical Address View project details and contacts
City, State (County) Oswego, NY 13126   (Oswego County)
Category(s) Single Trades
Sub-Category(s) Flooring
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The Park Hall Project Scope includes installing a gypsum underlayment along with new carpet flooring in the entire suite. This will require demolition of the existing flooring, abatement of the existing mastic, and selective removal for re-installation of millwork and countertops to accommodate the flooring work. All partitions are to remain in place, with the lower portions to be modified in place to accommodate the installation of the gypsum underlayment. Existing doors to either be braced and re-adjusted in place, or removed and rehung based on contractor option. Gypsum drywall, finish painting, and caulking as necessary to restore in kind required to finish the space within disturbed areas.

Details

Division 09 - Finishes, Flooring.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents