Similar Projects
Sparks Water Pumping Station and Elevated Tank Improvements
Renovation, Infrastructure
Bidding
$5,000,001 to $10,000,000 est. value
Towson, MD

Bonnie Brook Water Facilities Upgrade
Infrastructure
Bidding
Cambridge, MD

World-Wide Water Storage Tank Remediation
Term Contract
Post-Bid

World-Wide Water Storage Tank Remediation
Term Contract
Post-Bid

Cliffton Water System Improvements - Elevated Storage Tank
Results
Newburg, MD 20664

Salt, Brine, and Anti-Icing or De-Icing Agents, and Brine Production and Storage Systems
Results

Underground Water Storage Tanks for Fire Suppression
Infrastructure
Bidding
Columbia, MD

4,000 Gallon Storage Tank for Blue Juice Lavfluid
Post-Bid
Andrews Air Force Base, MD 20762

Ballast Tank Preservation
Results
Baltimore, MD

Wildlife Elevated Tanks A, B, C Painting
Infrastructure
Bidding
Laurel, MD

Design Build Water Tower Repairs
Post-Bid
Germantown, MD 20874

Keysers Ridge Water Storage Tank
Results
Oakland, MD 21550

Tank Removal
Infrastructure
Bidding
Owings Mills, MD 21117

Urbana High School Water Storage Tank Demolition
Demolition
Post-Bid
Ijamsville, MD 21754

Elk Neck State Park 60,000 Gallon Water Tank Reconditioning
Results
North East, MD 21901

Reported 08/05/2021 12:00 AM
Project Title

Germantown Water Tower

Physical Address View project details and contacts
City, State (County) Germantown, MD 20874   (Montgomery County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

A. This task order is to obtain Contractor Design-Build (DB) services to implement DOE recommendations in order to obtain recertification of the water tower in accordance with the American Water Works Association (AWWA). Appendix A (List of Modifications/Repairs/Upgrades) includes the list of DOE approved recommendations. It includes repair/update/replace cathodic protection, fall protection, and Non Destructive Testing (NDT) and Stress Analysis to determine the integrity of the water tower structure. B. The design-build work shall include updating the Federal Aviation Administration (FAA) lighting system on the water tower, replacing valves in the concrete valve pit below the water tower, and providing variable speed drives for pumps in the Boiler House to maintain water pressure for the interim condition while the water tower is out of service. Training shall be provided to plant personnel on operation of the temporary variable speed drives. C. The design phase of the project shall take 13 weeks (91 calendar days). The construction phase shall take 180 calendar days from the Government’s acceptance of the final design submission. The total period of performance for the contract is 271 calendar days.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 13 - Special Construction, Towers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents