Similar Projects
Poplar Island Cell 1C Inlet Repairs, Poplar Island, MD
Infrastructure
Design
$1,000,000 to $5,000,000 est. value
MD

Mousetown Road Culvert Replacements
Infrastructure
Bidding
$500,001 to $1,000,000 est. value
Hagerstown, MD 21740

Ilchester Property Retaining Wall at Patapsco Valley State Park
Infrastructure
Bidding
$100,000 to $500,000 est. value
Ellicott City, MD 21043

Longfield Drainage Improvements
Post-Bid
$2,500,001 to $5,000,000 est. value
Forestville, MD 20747

Design Build Cree Drive Drainage Improvements and Road Repair
Post-Bid
Forest Heights, MD 20745

Cox Creek DMCF +60 Dike Raising and Expansion
Results
MD 21226

Stormwater and Roadway Drainage Maintenance Services
Results

Beverly Triton Nature Park
New Construction
Construction
$3,000,000 est. value
Edgewater, MD 21037

Construction Services City Dock Stormwater and Flood Mitigation Improvements
New Construction, Infrastructure
Bidding
Annapolis, MD

Pipe, Corrugated Aluminum, Term Agreement
Term Contract
Post-Bid
Towson, MD

Bulkhead Cap Maintenance Phase 2
- 62,500 SF
Results
$100,000 to $500,000 est. value
Ocean City, MD 21842

Mousetown Road Culvert Replacements
Infrastructure
Bidding
$500,001 to $1,000,000 est. value
Hagerstown, MD

Girard Street Drainage System
Infrastructure
Post-Bid
Havre de Grace, MD 21078

Washingtonian Woods Slope Failure Remediation
Results
Gaithersburg, MD 20878

Mountainview Road Extension and SWM Project
Alteration
Post-Bid
Boonsboro, MD 21713

Last Updated 04/15/2022 01:13 PM
Project Title

Atlantic Coast of MD 2021 Berm Reconstruction

Physical Address View project details and contacts
City, State (County) Ocean City, MD   (Worcester County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $10,000,000 to $25,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Atlantic Coast of MD 2021 Berm Reconstruction Project: consist of approximately 1M CY of sand to be pumped from an offshore borrow area for replacement of the existing beach and dune system. The source of sand is located approximately 7-8 miles offshore.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Dredging, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents