Similar Projects
First Avenue - River To Grant - SR11 - City Of Tucson
Infrastructure
Conception
$71,988,200 CJ est. value
Tucson, AZ 85719

Houghton Road - 22nd Street To Irvington - SR1J - City Of Tucson
Infrastructure
Conception
$40,721,000 CJ est. value
Tucson, AZ 85747

AutoZone #3618 / Tucson (Ajo)
New Construction, Infrastructure - 7,000 SF
Design
$1,500,000 CJ est. value
Tucson, AZ 85757

Valencia - Kolb To Houghton - SR14 - City Of Tucson
Infrastructure
Design
$22,388,700 CJ est. value
Tucson, AZ 85746

Steam Pump Ranch BBQ and Bunk Buildings
New Construction, Infrastructure
Bidding
$480,500 CJ est. value
Oro Valley, AZ 85737

Sewer System Repair at Agua Caliente Elementary School
Infrastructure
Bidding
$2,000,000 CJ est. value
Tucson, AZ 85749

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

NolicCovered Wells Intertie Project (Waterline)
Infrastructure
Post-Bid
$1,000,000 to $3,000,000 est. value
Sells, AZ 85634

Fire Hydrant, Unidirectional Flushing Services, and Valve Preventative Maintenance
Term Contract, Infrastructure
Results
Tucson, AZ

Tucson - Benson Highway (I-10) (Ajo Way to MP 272)
Infrastructure
Results
$15,495,176 CJ est. value
Tucson, AZ 85706

Mandarina Off-Site Water & Sewer
Infrastructure
Construction
Marana, AZ

Water Distribution System Replacement
Renovation
Construction
$500,000 est. value
Tucson, AZ 85750

22nd Street Manufacturing and Warehouse Building
New Construction, Infrastructure - 16,100 SF
Pending Verification
$2,000,000 CJ est. value
Tucson, AZ 85713

South Kolb Road Self-Storage
New Construction, Infrastructure - 14,511 SF
Pending Verification
$2,000,000 CJ est. value
Tucson, AZ 85756

La Paloma Reclaimed Reservoir Rehabilitation - W310 - City of Tucson
Infrastructure
Conception
$2,289,700 CJ est. value
Tucson, AZ 85701

Last Updated 11/28/2022 12:02 PM
Project Title

Sierra Wash at Naranja Drive Drainage Improvements - Town of Oro Valley

Physical Address View project details and contacts
City, State (County) Oro Valley, AZ 85737   (Pima County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $1,156,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Reconstruction of riprap apron extension at the outlet of Naranja Drive conveying Sierra Wash As of November 28, 2022, this project is included in the Town of Oro Valley FY 2022-32 CIP. Information regarding a design team and the contractor selection has not been disclosed. A firm timeline for construction has not been established. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents