Similar Projects
New Ashburn Recreation Center
New Construction - 100,000 SF
Design
Ashburn, VA

Alleghany High School - Athletic Facilities
Renovation
Post-Bid
Covington, VA 24426

Big Blue Swim School
Build-Out
Post-Bid
Springfield, VA 22150

Renovation and Expansion of Mount Vernon REcenter
Renovation, Addition - 95,700 SF
Results
$25,000,000 to $30,000,000 est. value
Alexandria, VA

Gunston Park Enclosed Athletic Facility Improvements
Renovation
Results
Arlington, VA 22225

Athletics Complex Project
New Construction - 246,000 SF
Construction
$180,000,000 to $240,000,000 est. value
Charlottesville, VA 22903

Westwood Country Club Tennis Courts
New Construction - 44,231 SF
Construction
$400,000 to $600,000 est. value
Vienna, VA 22180

USTA Tennis Campus
New Construction
Pending Verification
$42,000,000 est. value
Leesburg, VA

PPEA Unsolicited Proposal Regional Indoor Sports Facility
New Construction - 160,000 SF
Post-Bid
$10,000,000 CJ est. value
Williamsburg, VA 23185

WAHS Softball Fieldhouse
New Construction
Results
$425,000 to $475,000 est. value
VA

HHMI Gym And Locker Rooms
Renovation - 6,208 SF
Construction
$500,000 est. value
Ashburn, VA 20147

Rockingham Park (Baseball/Softball) Overhead, Safety Netting
Renovation
Post-Bid
Penn Laird, VA 22846

Construction of Double Barrel Bullpens
New Construction
Results
Sutherland, VA 23885

Virginia Center Commons Sports Complex
New Construction - 181,000 SF
Construction
$40,000,000 est. value
Glen Allen, VA 23059

Baseball Outfield Vinyl Covered Wall and Fence Pad
Renovation
Results
Norfolk, VA

Last Updated 05/12/2022 03:49 PM
Project Title

Warhill Sports Complex Outdoor Basketball Replacements

Physical Address View project details and contacts
City, State (County) Williamsburg, VA 23188   (James City County)
Category(s) Entertainment/Recreation
Sub-Category(s) Athletic Facility
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

General Services and Parks and Recreation are in need of the replacement of three (3) outdoor basketball courts located at the Warhill Sports Complex. The following are minimum specifications in which would be acceptable. 1. Demo existing courts and rebuild three (3) basketball courts, approximately 210’ x 105’, 2,450 SY 2. Remove and properly dispose of six existing basketball goals, fencing, including fabric, rails, gates, posts, and fence post foundations. 3. Cut off and cap four existing drains. Existing drainage pipes to be abandoned in place and filled with suitable flowable fill. 4. Mill existing court to depth of 12”. Inject soil cement to create additional stability during milling operation. All excess millings to be disposed of on-site at the storage facility behind the Stadium. 5. Reshape existing stone base and laser grade, place and compact 6” of 21-A base stone over court area. Furnish and install six Bison Ultimate Fixed Height 6” square black post with unbreakable polycarbonate 42’ X 72” backboard with breakaway goal with 72” safe play area. Court layouts are to be the same as existing courts. Installation process is to comply with industry standards and manufacturer’s standards for installation. 6. Install 1’ X 1’ concrete curb surrounding the court in which the new fence posts will be installed and to establish suitable grade and drainage for courts. Finished court grade should provide a maximum 1% slope to provide sheet flow drainage towards the existing BMP on the north-east side of the courts. 7. Furnish and install approximately 630 LF of black vinyl standard fence 10’ high enclosing basketball courts. Terminal posts to be 3” O.D., line posts to be 2 ½” O.D., 1 5/8” top, middle and bottom rails, 9 gauge fusion bonded fabric, four walk gates that meet ADA standards. 8. Place and compact 1.5” leveling course of virgin-mix asphalt. 9. Place and compact 1.5” surface course of virgin-mix asphalt over leveling course. 10. Furnish and apply one coat of acrylic resurfacer over entire court surface. Flood courts to check for low areas/ponding in accordance with American Sports Builders Association guidelines. Remedy any low areas per guidelines. 11. Furnish and apply second coat of acrylic resurfacer over entire court surface after remedies, if any. 12. Furnish and apply the acrylic color finish system, consisting of two textured color filler coats and one textured color finish coat. This includes standard colors. 13. Layout, tape and hand paint 2” white playing lines on same.

Details

Athletic Facility, Renovation.
Division 01 - General Requirements, Construction Facilities.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings.
Division 09 - Finishes, Painting.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 31 - Earthwork, Site Clearing, Earth Moving.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Athletic and Recreational Surfacing, Fences and Gates.
Division 33 - Utilities, Water Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents