Similar Projects
Wiley Boulevard Trail From 16th Avenue SouthWest To Williams Boulevard (Highway 151) - 325052 - City Of Cedar Rapids
Infrastructure
Conception
$300,000 CJ est. value
Cedar Rapids, IA 52404

TIF Blairs Ferry Road Improvements And 18th Avenue Extension - 301881 - City Of Cedar Rapids
Infrastructure
Conception
$333,000 CJ est. value
Cedar Rapids, IA 52401

Two Basketball Courts at Hughes Park
Infrastructure
Design
$500,000 CJ est. value
Cedar Rapids, IA 52404

Cedar Rapids Flood Risk Management Project, Reach 1 McLoud Run Middle Reach Channel, Trail Bridge, Floodwall, 10th St. NE Road Raise
Infrastructure
Design
$10,000,000 CJ est. value
Cedar Rapids, IA 52401

Cold Storage Facility
Addition, New Construction, Infrastructure - 7,200 SF
Bidding
$550,000 CJ est. value
Hiawatha, IA 52233

North Linn MS/ES 2022 Remodel and Ventilation Improvements - Equipment
Renovation, Alteration
Post-Bid
Coggon, IA 52218

Francis Marion Intermediate School
Renovation, Addition
Post-Bid
Marion, IA 52302

Landscaping - U.S. 30
Infrastructure
Results
IA

Jackson Elementary Playground
New Construction
Results
Cedar Rapids, IA 52405

Kwik Trip - 1st Avenue NE / Cedar Rapids
New Construction, Infrastructure
Pending Verification
$2,400,000 CJ est. value
Cedar Rapids, IA 52402

Jones Park Repurposing - 307075 - City of Cedar Rapids
Infrastructure
Pending Verification
$500,000 CJ est. value
Cedar Rapids, IA 52401

2022 Bond Construction & Renovations
New Construction, Renovation
Conception
$50,000,000 est. value
Cedar Rapids, IA

2022 Institutional Roadway Improvements Project
Infrastructure
Post-Bid
$400,000 CJ est. value
Cedar Rapids, IA 52404

WPCF Process Improvement - Contract 1
Infrastructure
Results
$3,620,000 CJ est. value
Cedar Rapids, IA 52401

U-Haul - Lindale Mall / Cedar Rapids
Demolition, New Construction, Infrastructure - 140,000 SF
Pending Verification
$5,000,000 CJ est. value
Cedar Rapids, IA 52402

Last Updated 04/10/2023 12:10 PM
Project Title

Parkview Elementary School Rebid

Physical Address View project details and contacts
City, State (County) Marion, IA 52302   (Linn County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Elementary School, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $16,674,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

OPN Project no - 212130002 Bid security in the amount of 5% of the total bid in the form of certified check, credit union share draft, or surety bond written on an original AIA Document A310, Bid Bond, is required for this project at the time of Bid. The successful bidder will be required to provide surety Performance and Payment Bonds in an amount equal to one hundred percent (100%) of the Contract Sum Awards of Contract is anticipated to commence on or about March 28, 2022. Work may begin on May 19, 2022 and is scheduled to be Substantially Complete by July 14, 2023 as shown on the Contract Documents. A public hearing will be conducted at a meeting to be held at the Marion Independent School District Administration Building Board Room, 777 S. 15th Street, Marion, Iowa 52302, at 6:00 p.m., on March 7, 2022, at which time and place any person may appear and file objections to the proposed plans, specifications, form of contract, and the estimated cost of said project. The right is reserved to reject any and all bids, or any part thereof, and to waive informalities, and to enter into such contract or contracts as shall be deemed in the best interest of the Owner Project No. 06215072.01, 212130000 The deposit will be refunded to Bidders who return the Bidding Documents in good condition within fourteen days after award of project. The cost of replacement of missing or damaged documents will be deducted from the deposit. A public hearing will be conducted at a meeting to be held at the Marion Home School Building, Library, 1400 Tenth Avenue, Marion, Iowa 52302, at 7:30 a.m., on January 27, 2023, at which time and place any person may appear and file objections to the proposed plans, specifications, form of contract, and the estimated cost of said project. Awards of Contract is anticipated to commence on or about March 20, 2023. Work may begin as soon as weather permits and is scheduled to be Substantially Complete by July 14, 2024 as shown on the Contract Documents.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents