Similar Projects
Baker Road Crosswalk at Forest - City of Dexter
Infrastructure
Conception
$350,000 est. value
Dexter, MI 48130

Dexter-Chelsea Road Trail Connector - City of Dexter
Infrastructure
Conception
$1,500,000 est. value
Dexter, MI

Depot Street Mixed-Use Development
New Construction, Infrastructure
Design
$15,000,000 CJ est. value
Ann Arbor, MI 48104

Depot Street Mixed-Use Development
New Construction, Infrastructure
Design
$15,000,000 CJ est. value
Ann Arbor, MI 48104

Parkland Plaza Senior Living Facility - Rebid
New Construction, Infrastructure - 163,690 SF
Post-Bid
$50,000,000 CJ est. value
Ann Arbor, MI 48103

Parkland Plaza Senior Living Facility - Rebid
New Construction, Infrastructure - 163,690 SF
Post-Bid
$50,000,000 CJ est. value
Ann Arbor, MI 48103

2022 Bandemer Park Bridge Repairs and Renovations
Infrastructure
Results
$505,567 CJ est. value
Ann Arbor, MI 48104

2022 Bandemer Park Bridge Repairs and Renovations
Infrastructure
Results
$505,567 CJ est. value
Ann Arbor, MI 48104

Mill Creek Townhomes
New Construction, Infrastructure, Renovation - 7,010 SF
Construction
$21,000,000 CJ est. value
Ann Arbor, MI 48108

Mill Creek Townhomes
New Construction, Infrastructure, Renovation - 7,010 SF
Construction
$21,000,000 CJ est. value
Ann Arbor, MI 48108

Sutherland Square
New Construction, Infrastructure - 4,500 SF
Pending Verification
$50,000,000 CJ est. value
Ann Arbor, MI 48108

Sutherland Square
New Construction, Infrastructure - 4,500 SF
Pending Verification
$50,000,000 CJ est. value
Ann Arbor, MI 48108

Dan Hoey Road Sidewalk - City of Dexter
Infrastructure
Conception
Dexter, MI 48130

A2 North Maple Road Development / Ann Arbor
New Construction, Infrastructure
Design
$30,000,000 CJ est. value
Ann Arbor, MI 48103

The Grove at Veridian
New Construction, Infrastructure - 10,076 SF
Post-Bid
$10,000,000 CJ est. value
Ann Arbor, MI 48104

Last Updated 01/04/2024 01:35 PM
Project Title

Miller Avenue Apartments

Physical Address View project details and contacts
City, State (County) Ann Arbor, MI 48104   (Washtenaw County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Parking Garage, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation
Project Status Design Development, Construction start expected April 2024
Bids Due View project details and contacts
Estimated Value $3,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for an 8 unit apartment complex. As of January 4, 2024, they are laying the foundations. Vertical construction will start in a couple of months.

Details

4 Stories Above Grade, 16,875 SF.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Residential Equipment, Residential Appliances.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling.
Division 28 - Electronic Safety and Security, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents