Similar Projects
Last Updated | 03/31/2023 08:04 AM |
Project Title | Heritage Community Park Pedestrian Trail Renovation Project |
Physical Address | View project details and contacts |
City, State (County) | Rancho Cucamonga, CA 91737 (San Bernardino County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Park/Playground, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected July 2022 |
Bids Due | View project details and contacts |
Estimated Value | $237,914 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | For Heritage Community Park Pedestrian Trail Renovation Project Contractor s LICENSE: In accordance with provisions of Section 3300 of the California Public Contract Code, the City has determined that Contractor shall possess any and all contractors licenses, in form and class as required by any and all applicable laws with respect to any and all of the work to be performed under this contract including, but not limited to, a Class A License (General Engineering Contractor) in accordance with the provisions of the Contractor's License Law (California Business and Professions Code, Section 7000 et. seq.). Prevailing WAGES: In accordance with the provisions of Section 1770, et seq., of the Labor Code, the Director of the Industrial Relations of the State of California has determined the general prevailing rate of wages applicable to the work to be done. The Contractor will be required to pay to all persons employed on the project by the Contractor sums not less than the sums set forth in the documents entitled "General Prevailing Wage Determination made by the Director of Industrial Relations pursuant to California Labor Code, Part 7, Chapter 1, Article 2, Sections 1770, 1773, 1773.1."These documents may be obtained from the State The scope of work to be performed consists of, but not limited to, removal of asphaltic concrete pavement, removal of concrete curbs, removal of exercise equipment and footings, removal of signs and sign footings, construction of asphaltic concrete paving, construction of concrete mow curb, and installation of exercise equipment. The contract documents call for 35 working days for the Base Bid and 5 additional working days for the Additive Bid to complete this construction. Bid SECURITY: Each bid shall be accompanied by bid security in the form and amount specified in Public Contract Code Sections 20170 and 20171. See Bid Package for details. BOND: A Bid Bond, for at least 10% of the Contractor s Total Bid Proposal amount, must be included as part of the Contractor s sealed Bid Proposal. CONTACT - Questions regarding this Notice Inviting Sealed Bids shall be directed to Project Manager(s): Richard Favela (909) 477-2730 ext. 4108 & Kenneth Fung (909) 477-2730 ext. 4139. The City of Rancho Cucamonga, reserves the right to reject any bid or all bids and to waive any informality or irregularity in any bid. Any contract awarded will be let to the lowest responsive and responsible bidder. |
||||||||
Details |
|
||||||||
Bidder's List | View project details and contacts | ||||||||
Prospective Bidders | View project details and contacts | ||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |