Similar Projects
SMORE Trail Part II- Division Creek - C.8 - City of Big Bear Lake
Renovation, Alteration
Conception
$500,000 est. value
Big Bear City, CA 92314

Rathbun Creek Trail Phase 3 - C.5 - City of Big Bear Lake
Infrastructure
Conception
$1,591,600 est. value
Big Bear Lake, CA 92314

Amazon Warehouse Development / Central Avenue
New Construction, Infrastructure - 201,096 SF
Design
$22,000,000 CJ est. value
Upland, CA 91786

Starbucks and Burger King #4974 / Barstow
Demolition, New Construction, Infrastructure - 5,550 SF
Design
$1,700,000 CJ est. value
Barstow, CA 92311

RFP D/B - Hydrogen Fueling Station
Infrastructure
Bidding
$6,721,180 CJ est. value
Hesperia, CA 92345

Rock Springs Drive Pavement Rehabilitation Project - Rebid 2
Infrastructure
Bidding
$690,000 CJ est. value
Chino Hills, CA 91709

Fort Irwin Simulation Center
New Construction, Infrastructure - 70,000 SF
Sub-Bidding
$100,000,000 CJ est. value
Fort Irwin, CA 92310

O'Reilly Auto Parts (CL2) #6228 / Colton
New Construction, Infrastructure - 7,453 SF
Post-Bid
$2,000,000 CJ est. value
Colton, CA 92324

O'Reilly Auto Parts (CL2) #6228 / Colton
New Construction, Infrastructure - 7,453 SF
Post-Bid
$2,000,000 CJ est. value
Colton, CA 92324

Seventh Avenue Arrowhead Drive Road Improvement
Alteration
Results
Victorville, CA

HMA (Type A), Roadway Excavation, and Class 2 Aggregate Base
Infrastructure
Results
$5,700,000 est. value
Los Angeles, CA

O'Reilly Auto Parts (CL3) #6229 / Colton
New Construction, Infrastructure - 7,319 SF
Construction
$2,000,000 CJ est. value
Colton, CA 92324

VVC Stadium and Educational Event Center
New Construction, Renovation, Infrastructure
Construction
$32,338,000 CJ est. value
Victorville, CA 92395

State Street Village / Redlands Mall Development
New Construction, Infrastructure - 84,106 SF
Pending Verification
$275,000,000 CJ est. value
Redlands, CA 92373

State Street Village / Redlands Mall Development
New Construction, Infrastructure - 84,106 SF
Pending Verification
$275,000,000 CJ est. value
Redlands, CA 92373

Last Updated 03/31/2023 08:04 AM
Project Title

Heritage Community Park Pedestrian Trail Renovation Project

Physical Address View project details and contacts
City, State (County) Rancho Cucamonga, CA 91737   (San Bernardino County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $237,914 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

For Heritage Community Park Pedestrian Trail Renovation Project Contractor s LICENSE: In accordance with provisions of Section 3300 of the California Public Contract Code, the City has determined that Contractor shall possess any and all contractors licenses, in form and class as required by any and all applicable laws with respect to any and all of the work to be performed under this contract including, but not limited to, a Class A License (General Engineering Contractor) in accordance with the provisions of the Contractor's License Law (California Business and Professions Code, Section 7000 et. seq.). Prevailing WAGES: In accordance with the provisions of Section 1770, et seq., of the Labor Code, the Director of the Industrial Relations of the State of California has determined the general prevailing rate of wages applicable to the work to be done. The Contractor will be required to pay to all persons employed on the project by the Contractor sums not less than the sums set forth in the documents entitled "General Prevailing Wage Determination made by the Director of Industrial Relations pursuant to California Labor Code, Part 7, Chapter 1, Article 2, Sections 1770, 1773, 1773.1."These documents may be obtained from the State The scope of work to be performed consists of, but not limited to, removal of asphaltic concrete pavement, removal of concrete curbs, removal of exercise equipment and footings, removal of signs and sign footings, construction of asphaltic concrete paving, construction of concrete mow curb, and installation of exercise equipment. The contract documents call for 35 working days for the Base Bid and 5 additional working days for the Additive Bid to complete this construction. Bid SECURITY: Each bid shall be accompanied by bid security in the form and amount specified in Public Contract Code Sections 20170 and 20171. See Bid Package for details. BOND: A Bid Bond, for at least 10% of the Contractor s Total Bid Proposal amount, must be included as part of the Contractor s sealed Bid Proposal. CONTACT - Questions regarding this Notice Inviting Sealed Bids shall be directed to Project Manager(s): Richard Favela (909) 477-2730 ext. 4108 & Kenneth Fung (909) 477-2730 ext. 4139. The City of Rancho Cucamonga, reserves the right to reject any bid or all bids and to waive any informality or irregularity in any bid. Any contract awarded will be let to the lowest responsive and responsible bidder.

Details

Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents