Similar Projects
Bridge Reconstruction Program - 11086 - City of Sioux Falls
Demolition, New Construction, Infrastructure
Conception
$14,585,000 CJ est. value
Sioux Falls, SD 57104

RR Grade Separation, CE
Infrastructure
Conception
$10,000,000 CJ est. value
Sioux Falls, SD 57107

Dance Gallery / Sioux Falls
New Construction, Infrastructure - 20,000 SF
Design
$5,000,000 CJ est. value
Sioux Falls, SD 57105

East Ridge Affordable Housing / Sioux Falls
New Construction, Infrastructure
Design
$13,000,000 CJ est. value
Sioux Falls, SD 57104

Modify Interchange, Grading, PCC Surfacing
Infrastructure
Bidding
$41,571,000 CJ est. value
Sioux Falls, SD 57103

Construction of the Ellis and Eastern, Rail Junction
Infrastructure
Bidding
$250,000 CJ est. value
Sioux Falls, SD 57104

Harrisburg Schools 3rd Addition Mass Grading - South Cliff Avenue and East 85th Street
Infrastructure
Post-Bid
Sioux Falls, SD 57109

Hill-Outside, Drainage/Storm Sewer CAT 5.6 South Dakota State Penitentiary
Infrastructure
Post-Bid
$498,779 CJ est. value
Sioux Falls, SD 57104

Pump Station 203 Improvements
Results
$2,150,000 est. value
Sioux Falls, SD

Pump Station 240 Capacity Improvements
Results
Less than $5,687,511 est. value
Sioux Falls, SD 57110

Chick N Max / Sioux Falls
New Construction, Infrastructure - 2,720 SF
Construction
$1,000,000 CJ est. value
Sioux Falls, SD 57106

WholeStone Farms Pork Harvesting And Processing Facility
New Construction, Infrastructure
Pending Verification
$500,000,000 CJ est. value
Sioux Falls, SD 57104

1st Avenue Mixed Use Development
New Construction, Infrastructure - 5,000 SF
Pending Verification
$28,000,000 CJ est. value
Sioux Falls, SD 57104

Interchange Reconstruction
Infrastructure
Conception
$44,458,000 CJ est. value
Sioux Falls, SD 57103

Shared Use Path
Infrastructure
Design
$394,000 CJ est. value
Sioux Falls, SD 57105

Last Updated 11/18/2022 01:02 PM
Project Title

Mainline Pumps for Crooks Meter Building Project

Physical Address View project details and contacts
City, State (County) Crooks, SD 57020   (Minnehaha County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $667,845 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Construction for the Mainline Pumps for Crooks Meter Building Project. The Project is Located West of Crooks, Sd. Construction Will Be on Land Owned by Lewis & Clark. The Project Includes the Following Work: Add Two New 75hp Vertical Multistage Centrifugal Pumps and Related Equipment in the Existing Crooks Meter Building Located at 25704 469th Avenue, Crooks, Sd. The Work Includes All Piping, Fittings, Pumps, Motors, Vfds, Meters, Gauges, Valves, and Appurtenances (Including but Not Limited to Isolation Valves, Combination Air Valves, Check Valves, Chemical Feed and Storage Systems and Telemetry & Control Systems, as Required). The Work Includes All Electrical and Mechanical Equipment and Systems, Including Generator Replacement. Site Work Includes, but is Not Limited to, Excavation, Fill, Grading, Site Topsoiling, Seeding and Restoration. Bid Alternate 1 (if Awarded) 3rd Pump, Vfd, Piping and Valves. Clean Up, Startup Services, and All Other Miscellaneous Work Required but Not Herein Mentioned but Inferred From the Construction Contract Documents. Funding for This Project Comes From a Variety of Sources, Including Grants From the Federal Government; Grants From the States of South Dakota, Iowa, and Minnesota; and Funds From Member Systems. Specifically, the Base Bid Will Be Paid Using Federal Bi-partisan Infrastructure Law (Bil) Funding. Bil Funding Requires Compliance With Buy America Domestic Procurement Preference and Davis-bacon Act Wage Requirements. The Bid Alternate Will Be Paid Using Funds From Member Systems. For All Further Requirements Regarding Bid Submittal, Qualifications, Procedures, and Contract Award, Refer to the Instructions to Bidders That Are Included in the Bidding Documents.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents