Similar Projects
Hampton Manor of O'Fallon Assisted Living
New Construction - 71,291 SF
Conception
$14,000,000 est. value
O'Fallon, MO 63366

Tidal Wave Car Wash / St Peters
New Construction, Infrastructure - 5,400 SF
Design
$1,400,000 CJ est. value
Saint Peters, MO 63376

Jim Hennessey Trail Extension to Meadowlake Drive
Infrastructure
Bidding
$129,907 CJ est. value
Cottleville, MO 63304

Jim Hennessey Trail Extension to Meadowlake Drive
Infrastructure
Bidding
$129,907 CJ est. value
Cottleville, MO 63304

Lighting, Fencing And Security Surveillance System(S
Alteration
Post-Bid

Parks Asphalt Paving
Infrastructure
Post-Bid
Foristell, MO 63348

Pavement Sealing and Striping of Justice Center and Water Treatment Facilities Parking Lots
Results
Saint Peters, MO

Great Oaks Turn Lane Addition
Infrastructure
Results
Wentzville, MO

New Town Senior Living
New Construction - 48,500 SF
Pending Verification
$5,000,000 to $10,000,000 CJ est. value
Saint Charles, MO

Hampton Manor Assisted Living
New Construction - 68,315 SF
Pending Verification
$5,000,000 to $10,000,000 CJ est. value
O Fallon, MO

Spring Lakes #1 Lift Station Improvements
Infrastructure, Renovation
Bidding
$800,000 CJ est. value
Cottleville, MO 63366

Asphalt Removal and Replacement
Infrastructure
Post-Bid
Cottleville, MO

Hanley Road Reconstruction and Improvements
Infrastructure
Results
Dardenne Prairie, MO

Little Sunshine's Playhouse & Preschool
New Construction, Infrastructure - 11,354 SF
Pending Verification
$2,000,000 CJ est. value
Lake Saint Louis, MO 63367

Liberty High School Baseball Field Infield Turf Project
Infrastructure
Bidding
$1,900,000 CJ est. value
Lake Saint Louis, MO 63367

Last Updated 09/02/2022 03:02 PM
Project Title

Cedarhurst of Wentzville

Physical Address View project details and contacts
City, State (County) Wentzville, MO 63385   (Saint Charles County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Assisted Living Facility, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $15,600,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project is scheduled to appear before the Board of Aldermen on July 27, 2022 for the second and final reading of an ordinance to grant land use approval that will be valid for two years. The project will still require building permit submission, review and approval prior to moving to construction. A general contractor has been selected. No timeline for construction has been determined. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

3 Stories Above Grade, 132,000 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents