Similar Projects
UTMB - Emergency Room Building AHU Replacement
Post-Bid
Galveston, TX 77550

Comprehensive HVAC Solutions and Services - Part 1
Post-Bid
Pittsburg, TX 75686

Exhaust Ventilation System
Results
$25,000 to $100,000 est. value
El Paso, TX 79916

Annual Contract - Cooling Towers Cleaning Services
Term Contract
Results
San Antonio, TX

Texas A&M Dunn HVAC Replacement
Construction
College Station, TX 77840

Mold Removal and Remediation at Austin State Supported Living Center
Demolition
Post-Bid
Less than $382,328 est. value
Austin, TX 78756

Austin, TX ATCT DCD/HVAC Replacement
Results
$1,000,000 to $5,000,000 est. value
Austin, TX 78719

Split System Air Conditioning Units
Post-Bid
Huntsville, TX

Dedicated Outside Air Units
Results
$320,420 est. value
Mesquite, TX

Chiller Inspections and Repairs for Rusk State Hospital
Post-Bid
Rusk, TX 75785

Steam Units 2 and 3 Boiler Repair
Results
$549,000 est. value
Greenville, TX 75401

Multiple Campus RTU Replacements
Post-Bid
Mount Pleasant, TX 75455

Replace Two Chiller Circuites for a Building
Results
$250,000 to $500,000 est. value
Killeen, TX 76544

Red River Army Depot (RRAD) Utility Energy Services Contract
Post-Bid
New Boston, TX 75570

HVAC Refurbishing Fire Admin Building
Results
Irving, TX

Last Updated 12/19/2019 02:13 PM
Project Title

E--Replace 1A and 1B HVAC Admin Bldg

Physical Address View project details and contacts
City, State (County) Uvalde, TX 78801   (Uvalde County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value Less than $25,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The job consist of all the labor, materials, supplies to replace TWO York Heating and Air Conditioning Systems (Designed 1A and 1B) that serves the Hatchery administrative building Office areas, quality control lab, break room, storage areas and restrooms. The desired outcome is for two operational HVAC zoned systems to provide both heating and cooling by: a. Replacing existing 480Volt HVAC units with similar new HVAC units operating on the same operating voltage, OR b. Installing a new 208Volt HVAC units which shall also include installing new 208/120Volt branch circuits (Circuit breaker and conductors in conduit) for the new replacement HVAC Systems. Perform operational/commissioning HVAC check-out. Also, approximately six months after acceptance an additional operational inspection, whether heating during the dead of summer or cooling in the middle of winter, are functioning the way they should. See SOW for additional information.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents