Similar Projects
Panoche Road Bridge Over Tres Pinos Creek - RF 28-698 - San Benito County
Demolition, New Construction, Infrastructure
Conception
$4,065,001 CJ est. value
Paicines, CA 95043

Panoche Road Bridge Over Tres Pinos Creek - RF 28-698 - San Benito County
Demolition, New Construction, Infrastructure
Conception
$4,065,001 CJ est. value
Paicines, CA 95043

Construct a New Interchange at Castroville Boulevard and Highway 156
Alteration
Design
$25,000,000 est. value
San Juan Bautista, CA 95045

Rocks Road Bridge Replacement Over Tres Pinos Creek - RF 33-705 - San Benito County
Demolition, New Construction, Infrastructure
Design
$3,104,000 CJ est. value
San Juan Bautista, CA 95045

Pavement Replacement
Infrastructure
Post-Bid
$280,000 est. value

Hollister Air Attack Base - Utility Installations
Infrastructure
Post-Bid
$100,000 CJ est. value
Hollister, CA 95023

Widening Highway From 2-Lane to 4-Lane Controlled Access Highway
Infrastructure
Results
$55,000,000 est. value
CA

EWWTP Well 3 Drilling
Infrastructure
Results
$587,085 CJ est. value
Elmira, CA 95625

Felipe Nine
New Construction, Infrastructure - 337,710 SF
Pending Verification
$118,000,000 CJ est. value
Hollister, CA 95023

Felipe Nine
New Construction, Infrastructure - 337,710 SF
Pending Verification
$118,000,000 CJ est. value
Hollister, CA 95023

Fairview Road - Los Viboras Road to Aquistapace Road - San Benito County
Alteration
Conception
$363,950 est. value
Hollister, CA 95023

Shore Road - Highway 25 to San Felipe Road - PWB-2103 - San Benito County
Infrastructure
Design
$5,061,000 est. value
Hollister, CA 95023

Street Repairs at Various Locations
Infrastructure
Post-Bid
$600,000 CJ est. value
Hollister, CA 95023

Bell Avenue Complete Street Rehabilitation Project
Infrastructure
Results
$4,163,870 est. value

Bert Drive Industrial
New Construction, Infrastructure - 30,010 SF
Pending Verification
$16,200,000 CJ est. value
Hollister, CA 95023

Last Updated 06/20/2023 12:12 PM
Project Title

Wright Road Cannabis Greenhouse

Physical Address View project details and contacts
City, State (County) Hollister, CA 95023   (San Benito County)
Category(s) Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Manufacturing/Processing Plant, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $182,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of three greenhouse buildings for a cannabis cultivation facility. As of June 20, 2023, permits have yet to be applied or issued. Extension on development plans were approved August 2022 by the Hollister Planning Commission. Information regarding the selection of an architect and general contractor has not been provided. A firm timeline has not been established. * *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

340,000 SF.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Lockers.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping, Pneumatic Conveying Lines, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Batching Equipment, Conveyors, Cranes and Hoists, Specialty Material Handling Equipment, Manufacturing Equipment, Manufacturing Lines and Equipment, Container Processing and Packaging.
Division 44 - Pollution and Waste Control Equipment, Air Pollution Control, Odor Control, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents