Similar Projects
Encapsulating of the Existing Lead Paint on all Exterior Metal Stoop Railings
Alteration
Bidding
$250,000 est. value
Quincy, MA 02169

Installing New Siding and Other Items of Full Exterior of the Building
Alteration
Bidding
$110,000 est. value
Norfolk, MA 02056

Furnish and Install 3 Flag Poles
Infrastructure
Post-Bid
Less than $300,000 est. value
Boston, MA

Building Metal Siding Replacement
Alteration
Post-Bid
$35,000 est. value
Medway, MA

Exterior West Stairwell
Results
$40,000 est. value
Canton, MA 02021

Balcony Repairs
Results
$65,000 est. value
Milton, MA 02186

Insulation Upgrade Project at Lakeview Drive 200-1 Family Housing Development
Alteration
Bidding
$357,593 est. value
Weymouth, MA 02189

Memorial Hall Exterior Improvements Project
Alteration
Post-Bid
$2,500,000 est. value
Canton, MA

Decking Replacement
Results
$16,000 est. value
Walpole, MA

Senior Center Re-siding
Alteration
Bidding
$110,000 est. value
Norfolk, MA

Storefront Reactivation at Main Street Theater Block
Alteration
Post-Bid
$1,200,000 est. value
Boston, MA

Handicap Ramp Replacement
Results
Boston, MA 02118

Replacement of Windows on the East Facade With Masonry Repairs - Sub
Alteration
Post-Bid
$261,132 est. value
Canton, MA 02021

BCEC Interior Expansion Joint Repair P48
Alteration
Results
$150,000 est. value
Boston, MA

Exterior Envelope Repair - Five Buildings - GC Bid
Alteration
Post-Bid
$700,000 est. value
Brookline, MA

Last Updated 07/15/2022 08:15 AM
Project Title

Envelope Repair Project at Red Brick Schoolhouse

Physical Address View project details and contacts
City, State (County) Franklin, MA 02038   (Norfolk County)
Category(s) Single Trades
Sub-Category(s) Finishes/Exterior
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $175,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work to be performed will removal of all paint from exterior brick masonry walls; repointing all exterior brick 100%; removal of all clapboard siding and replacement with cedar clapboard siding; removal and replacement of all windows and doors; remaining wood trim at fascia, rake, and eaves shall have existing paint removed; replacement of deteriorating trim, all trim refastened and pa8inted; removal and replacement of gutters and downspouts and coating all brick masonry; and other incidental work as required.

Details

Division 09 - Finishes.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents