Similar Projects
Route 70 West Hotel Development
New Construction, Infrastructure
Conception
$5,000,000 CJ est. value
Cherry Hill, NJ 08002

Route 70 West Hotel Development
New Construction, Infrastructure
Conception
$5,000,000 CJ est. value
Cherry Hill, NJ 08002

Pennsauken Veterinary Associates Expansion
Addition, Demolition, Renovation, Infrastructure
Design
$600,000 CJ est. value
Pennsauken, NJ 08110

Dunkin Donuts
New Construction, Infrastructure - 1,884 SF
Design
$575,000 CJ est. value
Voorhees, NJ 08043

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Intersection Improvements to Martin Luther King Jr. Boulevard and Broadway
Infrastructure
Results
Camden, NJ 08103

2014 Sanitary/Combined Sewer Reconstruction Project Area A and 27th Street Between Federal Street and Marlton Pike
Infrastructure
Results
Camden, NJ

Brightmoor At Winslow
New Construction, Infrastructure - 25,000 SF
Construction
$118,000,000 CJ est. value
Winslow Township, NJ 08081

Lidl - North White Horse Pike / Somerdale
New Construction, Infrastructure - 31,000 SF
Pending Verification
$5,000,000 CJ est. value
Somerdale, NJ 08083

Lidl - North White Horse Pike / Somerdale
New Construction, Infrastructure - 31,000 SF
Pending Verification
$5,000,000 CJ est. value
Somerdale, NJ 08083

Quality First Solutions Addition
Addition, Demolition, Infrastructure, Renovation - 2,146 SF
Conception
$600,000 CJ est. value
Cherry Hill, NJ 08002

AutoZone #5353 / Stratford
New Construction, Infrastructure - 7,000 SF
Design
$1,500,000 CJ est. value
Stratford, NJ 08084

Parking Lot Mill and Overlay Project at Cherry Hill High School East
Infrastructure
Post-Bid
Cherry Hill, NJ 08003

Resurfacing of Sicklerville Road
Infrastructure
Results
Lindenwold, NJ

Last Updated 08/14/2023 12:12 PM
Project Title

Roadway and Drainage Improvements Along Greentree Road (CR674) From Marlton Pike (NJ Route 70)

Physical Address View project details and contacts
City, State (County) Cherry Hill, NJ 08003   (Camden County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected June 2022
Bids Due View project details and contacts
Estimated Value $385,000 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Sealed bids for Bid #B7-22 ROADWAY AND DRAINAGE IMPROVEMENTS ALONG GREENTREE ROAD (CR674) FROM MARLTON PIKE (NJ ROUTE 70) TO THE BURLINGTON COUNTY LINE Copies of the bidding documents must be obtained by registering and downloading all documents from the Camden County website. Bidders are required to comply with the requirements of P.L. 1975, c. 127 (N.J.A.C. 17:27) and N.J.S.A. 10:5-31 et seq. Bidders are required to comply with the requirements of P.L. 1999, c. 238 (N.J.S.A. 34:11-56.48 to 57), where applicable. All bidders are responsible for obtaining complete bid documentation from the County at the address listed above. In the event of any inconsistencies between this advertisement, as published, and the bid documentation, the bid documentation shall control.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents