Similar Projects
Metro Center - Master Plan
New Construction
Design
Aurora, CO 80012

Murphy Creek Parcel 3E South
New Construction, Infrastructure
Design
$7,000,000 CJ est. value
Aurora, CO 80011

Medical Office Shell Building / Aurora
New Construction, Infrastructure - 11,240 SF
Post-Bid
$2,700,000 CJ est. value
Aurora, CO 80015

Canyons Filing 2, 1st Amendment Lot Development Construction Project
Infrastructure
Post-Bid
Centennial, CO

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

On Call Region 1 Asphal Paving Services
Results

Englewood Station Apartments
New Construction, Infrastructure
Construction
$83,000,000 CJ est. value
Englewood, CO 80110

Legacy at Metro Center
New Construction, Infrastructure
Pending Verification
$30,000,000 CJ est. value
Aurora, CO 80011

King Soopers Fuel at Arapahoe Crossing
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Aurora, CO 80016

Living Water Express Car Wash
New Construction, Infrastructure
Design
$750,000 CJ est. value
Aurora, CO 80012

Construction of the Filing 10, Filing 11, and Fultendale St. Roadways
Infrastructure
Post-Bid
Aurora, CO 80040

Bradley House Parking Lot Asphalt & Concrete Repair/Replacement
Results
Less than $75,000 est. value
CO

RiverPark Mixed-Use Project / Littleton
New Construction, Infrastructure
Pending Verification
$200,000,000 CJ est. value
Littleton, CO 80120

Centennial Medical Plaza Center
New Construction, Renovation, Infrastructure - 61,000 SF
Design
$20,000,000 CJ est. value
Centennial, CO 80112

Z--MATOC - IMR Bridges
New Construction
Post-Bid
$10,000,000 est. value

Last Updated 12/20/2022 11:16 AM
Project Title

Nine Mile Pedestrian Bicycle Bridge Over SH-83

Physical Address View project details and contacts
City, State (County) Aurora, CO 80015   (Arapahoe County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected January 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $17,632,549 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of December 20, 2022, this project has not yet been awarded. A timeline for award has not yet been established. The Nine Mile Pedestrian Bicycle Bridge Over SH-83 is a partnered Colorado Department of Transportation (CDOT) project that will consist of the following work to be performed: Construction of a new covered and enclosed pedestrian bridge spanning S. Parker Road (SH-83) Construction of bridge landings, including elevator towers with mechanical, maintenance, electrical rooms, and stairs and elevators at each end of the bridge Installation of four elevators Installation of temporary and permanent concrete flatwork and landscaping for access to and around the landings and bridge Resetting of a CDOT owned overhead sign structure in the median of S. Parker Road Modifications to existing wayfinding signage Anticipated Construction Period: December 2022 to January 2024. Participation Requirements - Disadvantaged Business Enterprise (DBE) General Requirements - Bid Deposit Required - Insurance Required - Prevailing Wage Required Question Acceptance Deadline 10/21/2022 05:00 PM EDT Questions are submitted online No To ensure bidders have a clear understanding of the specifications and scope of work requirements, an Optional Pre-Bid Conference is scheduled. Attendance is not required, but highly encouraged. This will be an online event using Microsoft Teams. Interested parties may join the meeting by using the following event link: Each bid response shall be submitted on the prescribed forms supplied in the Project Manual. Each Bid shall be accompanied by an appropriate guarantee in the form of a Bid Bond made payable to the City of Aurora in an amount of not less than five percent (5%) of the amount of the Bid. Original bid bonds do not have to be mailed; however, each bidder should maintain the original on file should the City request it at a later time. Join by phone +1-408-418-9388 United States Toll

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents