Similar Projects
Sun Country Pump Station and Hydropneumatic Tank
New Construction
Bidding
$4,700,000 est. value
Crowley, TX 76036

Grease Trap and Lift Station Services
Infrastructure
Bidding
Pasadena, TX

Bay Colony Lift Station Expansion Phase I
Post-Bid
League City, TX 77573

Sherwood Wastewater Lift Station & Various Upgrades
Post-Bid
Cedar Hill, TX 75104

42" Gravity Outfall Twin Lakes Boulevard
Results
TX

Lift Station No. 1 Improvements
Results
$850,000 est. value
TX

Highway 84 Corridor Wastewater System Improvements Phase 2 Contract A
Construction
Less than $8,102,100 est. value
McGregor, TX 76657

Hillwood Lift Station
Infrastructure
Bidding
TX

Elmendorf Water Supply Project
Post-Bid
Elmendorf, TX 78112

Fountain View Regional LS Construction and Abandonment of Westheimer No. 1 LS
Results
$21,957,065 est. value
Houston, TX

Liberty Hill City Park - Swim Center, Lift Station and Force Main
Infrastructure
Bidding
Liberty Hill, TX 78642

Wastewater Treatment Plant Rehabilitation and Lift Station Conversion
Post-Bid
$1,365,000 est. value
Katy, TX 77449

South Storm Water Pump Station Automation
Results
Richmond, TX 77406

Travis Ranch 3F Lift Station Improvements
Post-Bid
Heath, TX 75087

Wastewater Treatment Facilities, Reclaimed/Re-use stations, Sanitary Sewer Lift Stations and Water Facilities
Results
Rosenberg, TX 77471

Last Updated 08/06/2021 06:04 PM
Project Title

Construction of Coronado I Booster Station Pump Can Replacement

Physical Address View project details and contacts
City, State (County) El Paso, TX   (El Paso County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $189,900 to $278,520
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work under this contract shall be for furnishing all labor, materials, transportation and services for the construction and installation of the following work: The removal and demolition of five existing pump cans, concrete slab, furnish and installation of five new pump cans, removal, and replacement of 12-inch suction piping, concrete encasement of the new pump cans, new inertia blocks and slabs. Contractor shall coordinate with EP Water to keep the booster station operational during individual can replacement. EP Water shall be responsible for station shut-down and disconnecting.

Details

Lift and Pump Stations, New Construction.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents