Similar Projects
Walton Drive - TOD 20-01 - City of Corinth
Infrastructure
Conception
$5,200,000 CJ est. value
Corinth, TX 76208

Walton Drive - TOD 20-01 - City of Corinth
Infrastructure
Conception
$5,200,000 CJ est. value
Corinth, TX 76208

Northlake Entryway Monumentation
Infrastructure
Design
$400,000 CJ est. value
Northlake, TX 76247

Windsong Ranch Phases 7D & 7H
New Construction, Infrastructure - 185,000 SF
Design
Prosper, TX 76227

Construct Pedestrian Infrastructure
Infrastructure
Bidding
$994,511 CJ est. value
Denton, TX 76226

RFQ Construction Manager at Risk - For Neighborhood 2 and 6
Infrastructure
Bidding
$42,000,000 CJ est. value
Denton, TX 76201

FM 1171 - Pavement Markings
Infrastructure
Sub-Bidding
$1,365,160 CJ est. value
Flower Mound, TX 75022

Furnish and Installation of Fence at Fire Station #2
Infrastructure
Sub-Bidding
$700,000 CJ est. value
Little Elm, TX 75068

Water, Sewer, and Drainage Improvements for Union Park Phase 6A
Post-Bid
Little Elm, TX

Utility Improvements for Prosper Elms Apartments Phase 1
Post-Bid
Aubrey, TX 76227

16" Water Line Extension
Results
Argyle, TX

Tom Harpool Regional Water Treatment Plant North Transmission Main: Phase 1
Results
$8,500,000 est. value
Lewisville, TX

Four Corners Shopping Center - Velvet Taco - Block A - Lot 10
New Construction, Infrastructure - 3,442 SF
Pending Verification
$1,000,000 CJ est. value
Frisco, TX 75033

Stonebrook Circle
New Construction, Infrastructure
Pending Verification
$10,000,000 CJ est. value
Frisco, TX 75033

Vintage Drive Road - 276 (Maintenance) - SR 24-01 - City of Corinth
Infrastructure
Conception
$425,000 CJ est. value
Corinth, TX 76210

Last Updated 07/28/2022 01:34 PM
Project Title

Southwest Lift Station, Force Main and Gravity Improvements - WW 24-02 - City of Corinth

Physical Address View project details and contacts
City, State (County) Corinth, TX 76210   (Denton County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected June 2024
Bids Due View project details and contacts
Estimated Value $2,530,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

A detailed scope has not yet been determined. The project is included in the city's 2022-2026 Capital Improvement Program (CIP). As of July 28, 2022, further details regarding design and construction have not been identified.* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents