Similar Projects
North End Around Taxiway (Neat) - Private Access Drive Construction
Infrastructure
Post-Bid
Charlotte, NC

On-Street Parking and Curb Lane Management
Infrastructure
Post-Bid
Charlotte, NC

Sidewalk System Work Contract No. 4510-SDWK21
Results
Concord, NC 28025

Bethel School Road Sidewalk Improvements
Results
$100,000 to $200,000 est. value
Midland, NC

Rowan-Cabarrus Community College South Campus Parking Lot Repairs
Infrastructure
Post-Bid
Concord, NC

Rowan-Cabarrus Community College College Station Campus Walking Ramp Installation
Results
Kannapolis, NC 28083

Development Services - Library and Senior Center Facility
New Construction, Infrastructure - 40,000 SF
Post-Bid
Concord, NC 28027

Coddle Creek Greenway - Afton Run
Infrastructure
Results
$575,313 est. value
Concord, NC

General Aviation Terminal Parking Lot Rehabilitation
Infrastructure
Post-Bid
Concord, NC 28027

Sandy Porter Road/ South Tryon Street Intersection Improvement (PMES51216020)
Infrastructure
Results
$1,069,000 est. value
Charlotte, NC

Sidewalk System Work
Infrastructure
Results
Concord, NC

Wilson Street Park - Phase I
New Construction, Infrastructure
Results
$70,000 est. value
Concord, NC 28025

Concord Middle School Parking Lot Improvements
Infrastructure
Results
Less than $500,000 est. value
Concord, NC 28025

Construction of Concrete Curb Ramps and Retrofitting Existing Ramps (Contract B)
Infrastructure
Results

Old Charlotte Sidewalk Extension
Infrastructure
Results
Concord, NC 28027

Last Updated 04/22/2022 07:24 AM
Project Title

Swink Street Southwest Sidewalk Extension

Physical Address View project details and contacts
City, State (County) Concord, NC 28027   (Cabarrus County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project Information is generally described as follows: The work under this contract includes, but is not limited to, the selected Contractor performing specified work for the addition of the sidewalk and replacement of the corresponding pavement and driveways such as breaking up, removal, disposal of existing pavement and curb and gutter segments, proof rolling and establishment of subgrade, installation and tie-ins of concrete infrastructure, reconstruction and paving of disturbed roadway sections, erosion control and other associated work along Swink St. SW and adjoining properties as noted in the Swink St. SW Sidewalk System construction plans, and as discussed in the pre-bid conference, including mobilizations, demobilizations, all labor including special subcontracting, permits, licenses, certifications, handwork, fabrications, tools, equipment, all materials, miscellaneous hardware, any supporting hardware and software, consumables, preparations, adhesives, other items and incidentals, excavations and grading, hauling, traffic control safety operations, site security, security of the work, infrastructure removals and resettings, incidental infrastructure relocations, removal of any debris, cleanup, and disposal(s), seeding and mulching, testings, cleanup, and disposal(s), touch-up repairs, special subcontracting, permits, licenses, and all else required as necessary in accordance with the Contract documents to the satisfaction of the Director and the City of Concord.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents