Similar Projects
Bay Doors Maintenance and Repairs
Term Contract
Bidding
$11,000 est. value
Belleview, Citra, Dunnellon, Fort McCoy, Ocala, Reddick, Silver Springs, Summerfield, Umatilla, FL 34420

Overhead Door Preventative Maintenance and Repair
Term Contract
Bidding
Palm Bay, FL

Impact Doors
Post-Bid
Okeechobee, FL

Cowperthwaite Building Window Replacement
Post-Bid
Winter Haven, FL 33881

Replacement of City Hall Windows
Results
Avon Park, FL 33825

Glazing and Glass Work
Results
Less than $3,000,000 est. value
Stuart, FL 34996

Window Replacement
Alteration
Bidding
FL

Impact Windows
Renovation
Post-Bid
Okeechobee, FL

YMCA - Wind Retrofit Project
Results
Edgewater, FL 32132

Installation and Repair Services of Doors and Related Hardware
Term Contract, Alteration
Bidding
Sarasota, FL

Door and Gate Access System, Maintenance, Repair, Replacement and/or Installation Citywide
Post-Bid
North Port, FL

Sumter County Overhead Door Maintenance and Repair Services
Results
Wildwood, FL 34785

Fleet Management Carwash Facility Roll-Up Door Replacement
Post-Bid
$12,000 est. value
Naples, FL 34112

Purchase and Installation of Touchless Door Operators
Results
Clermont, FL 34712

Bottom Bar, Slide Locks and Chain for Two (2) 10`X10`Overhead Doors
Post-Bid
Ormond Beach, FL

Last Updated 04/29/2022 07:12 AM
Project Title

Replace Windows at Avon Park Middle In Building 3

Physical Address View project details and contacts
City, State (County) Avon Park, FL 33825   (Highlands County)
Category(s) Single Trades
Sub-Category(s) Windows/Doors
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

To supply all supervision, labor and equipment to replace existing windows throughout building 3 at Avon Park Middle School in Avon Park, Florida. Remove the existing Bard package AC units on the north side of each classroom to allow removal of the existing windows. Set aside Bard units and protect to allow reinstallation at a future date. Disconnect the main duct work extension that is attached to the Bard unit, allowing the full removal of the Bard units as well as the existing windows

Details

Division 08 - Openings, Doors and Frames, Windows.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents