Similar Projects
Cornell 8th Street Resurfacing
Infrastructure
Design
$390,000 CJ est. value
Cornell, WI 54732

Cornell 8th Street Resurfacing
Infrastructure
Design
$390,000 CJ est. value
Cornell, WI 54732

Barnyard System Construction
New Construction, Infrastructure
Bidding
$75,000 CJ est. value
Chippewa Falls, WI 54729

2021 LRIP Road Improvements
Post-Bid
New Auburn, WI 54757

Lift to Road
Infrastructure
Post-Bid
Bloomer, WI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Spring and River Street Utility and Street Improvement
Results
Chippewa Falls, WI 54729

Roadway Repaving Lake Wissota State Park
Infrastructure
Construction
$727,350 CJ est. value
Chippewa Falls, WI 54729

RFP Engineering - Elk Mound - Bloomer
Infrastructure
Pending Verification
$8,000,000 CJ est. value
Jim Falls, WI 54748

RFP Engineering - Elk Mound - Bloomer
Infrastructure
Pending Verification
$8,000,000 CJ est. value
Jim Falls, WI 54748

Culvert Installation
Infrastructure
Post-Bid
WI 54724

Cedar Street Utility and Street Improvement
Results
Chippewa Falls, WI 54729

Road Work
Infrastructure
Post-Bid
Bloomer, WI 54724

Bridgewater Avenue Utility and Street Improvement
Results
Chippewa Falls, WI 54729

Crack Sealing
Infrastructure
Post-Bid
Bloomer, WI 54724

Last Updated 08/22/2022 09:41 AM
Project Title

Parking Lot Repaving

Physical Address View project details and contacts
City, State (County) Chippewa Falls, WI 54729   (Chippewa County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $219,500 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

In general the work consists of: Pulverizing and grading the existing parking lot surface, HMA pavement, curb and gutter replacement, pavement markings, and restoration. The Division of Facilities Development, hereinafter termed DFD, hereby announces that it is advertising for bids from certified contractors for the above project NOTICE: All potential bidders must become certified by DOA prior to submitting bids on state construction projects with budgets over $50,000. All bids received from contractors who are not certified will be rejected. The 2017-2019 Wisconsin State Budget (2017 Wisconsin Act 59) repealed Wisconsins prevailing wage laws. Effective September 23, 2017, state prevailing wage requirements on state building projects no longer apply. These changes take effect for projects advertised for bid after September 23, 2017. This change does not affect the Federal Davis Bacon Act requirements.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents