Similar Projects
Big Wood River Bridge
New Construction, Renovation
Bidding
Ketchum, ID

Replacing the Existing Bridges on I-15 at MP 40.425
New Construction, Infrastructure
Results
$5,000,000 to $10,000,000 est. value
ID

South Idaho Canal Bridge
New Construction, Infrastructure
Results
$1,000,000 to $2,500,000 est. value
ID

Consultant Services for Sand Road Bridge
New Construction
Post-Bid
ID

Replace Four Local Bridges
New Construction, Infrastructure
Results
$5,000,000 to $10,000,000 est. value

Replace Four Local Bridges
New Construction, Infrastructure
Results
$5,000,000 to $10,000,000 est. value

Replace Four Local Bridges
New Construction, Infrastructure
Results
$5,000,000 to $10,000,000 est. value

Third River Crossing Planning and Environmental Linkage (Pel) Study
New Construction
Post-Bid

Third River Crossing Planning and Environmental Linkage (Pel) Study
New Construction
Post-Bid

Bridge Replacement at Elizabeth Park Road
New Construction, Infrastructure
Bidding
$15,000,000 to $25,000,000 est. value
Kellogg, ID 83837

Third River Crossing Planning and Environmental Linkage (Pel) Study
New Construction
Post-Bid

Repairing Bridge Decks With Epoxy or Concrete Overlays
New Construction, Infrastructure
Bidding
ID

Constructing Approximately 5.8 Miles Of New 4 Lane Divided Highway On Us-95 Between Thorn Creek Road And Moscow In Latah County. Two 318 Foot Bridge Structures
New Construction, Infrastructure
Bidding
ID

Over Snake River Bridge Repairs
New Construction, Infrastructure
Bidding
$500,000 to $1,000,000 est. value
ID

Bridge Replacement at 500 South 100 West
New Construction, Renovation
Post-Bid
Rupert, ID 83350

Reported 10/13/2021 12:00 AM
Project Title

Bridge Replacement for Minidoka County

Physical Address View project details and contacts
City, State (County) Acequia, ID 83350   (Minidoka County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Bridge, New Construction.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents