Similar Projects
VLS Painting and Marking
Term Contract
Design
Norco, CA 92860

Electrical, Framing, Mechanical, Flooring,Plumbing, Drywall
Alteration
Design
San Francisco, CA 94128

El Toro Park Restroom Building Security Gates
Renovation
Sub-Bidding
$300,000 CJ est. value
Lake Forest, CA 92630

Fairbarin Water Treatment Plant Lab Building Exterior Improvements
Alteration
Post-Bid
$1,800,000 est. value
Sacramento, CA 95826

Construction Services (Replace Concrete Landing, Stairs and Guard Rails), at Arrowhead Area Office)
Term Contract, Alteration
Post-Bid
Running Springs, CA 92382

Front Entrance Soffit Replacement
Term Contract
Results
Richmond, CA 94801

CCC Camarillo Center Gutter and Downspouts Replacement
Alteration
Results
$200,000 est. value
Camarillo, CA

New Lunch Shelter Project at Heritage Elementary School
Alteration
Post-Bid
Lodi, Stockton, CA 95240

Demuth Community Center Egress And Gym Improvements
Renovation, Alteration
Results
$750,000 to $950,000 est. value
Palm Springs, CA 92264

CCC Tahoe Center Gutter and Downspouts Installation
Alteration
Post-Bid
$25,000 est. value
South Lake Tahoe, CA 96150

MJC West Campus Soccer Field Shade Canopies
Alteration
Results
$85,000 est. value
Modesto, CA 95358

On-Call Handyperson Services
Alteration
Post-Bid
Livermore, CA

Hardscape Repair
Alteration
Results
$700,000 est. value
Paradise, CA

Painting Services Desert Housing
Term Contract
Post-Bid
CA

New City Yard Install Erect City Furnished Storage Covering
Alteration
Results
Yucaipa, CA 92399

Last Updated 01/25/2023 10:33 PM
Project Title

Reclamation District 17 Levee Access Gates

Physical Address View project details and contacts
City, State (County) Lathrop, CA 95330   (San Joaquin County)
Category(s) Single Trades
Sub-Category(s) Finishes/Exterior
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $54,508 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The City of Lathrop invites sealed informal bids for the construction of public improvements for the Reclamation District 17 Levee Access Gates, City of Lathrop, California. The scope of work to be performed under this contract is generally described as provision of materials and construction of two (2) steel tunnel gates and two (2) steel pipe gates to control access to Reclamation District 17's levees on the San Joaquin River in Lathrop. The value of this work is estimated at $30,000 and requires the following bonds at the indicated percentages of contract value: Bid (10%), Payment (100%), Performance (100%) and a Guaranty Bond (10%) at the completion of the project, valid for one year. A valid California C-13 Fencing Contractor's license is required to bid on this project. DIR Registration. Each Bidder submitting a proposal to complete the work, labor, materials and/or services ("Work") subject to this procurement must be a Department of Industrial Relations registered contractor pursuant to Labor Code Section 1725.5 ("DIR Registered Contractor"). A Bidder who is not a DIR Registered Contractor when submitting a proposal for Work is deemed "not qualified" and the proposal of such a Bidder will be rejected as nonresponsive. Pursuant to Labor Code Section 1725.5, all Subcontractors identified in a Bidder's Subcontractors' List shall be DIR Registered Contractors. If awarded the Contract for the Work, at all times during performance of the Work, the Bidder and all Subcontractors, of any tier, shall be DIR Registered Contractors. All communication relative to the administration of this work shall be directed to Ken Reed, Senior Construction Manager, at kreed@ci.lathrop.ca.us, (209) 941-7363 or by calling the Public Works Department at (209) 941-7430. The engineer's estimate for the work contemplated by the Base bid schedule is $30,000 The work to be performed under this contract is generally described as, but not necessarily limited to provision of materials, drilling into concrete and welding to fabricate two (2) steel tunnel gates and two (2) steel pipe gates. All project materials shall be supplied by the Contractor, and the Work shall be performed in accordance with the Standard Specifications and the Construction Documents as defined in the General Conditions. The Work shall be complete, and all work, materials, and services not expressly shown or called for in the Construction Documents which may be necessary for the complete and proper construction of the Work in good faith shall be performed, furnished, and installed by the Contractor as though originally specified or shown in said Construction Documents, at no increase in cost to the City.

Details

Division 09 - Finishes.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents