Similar Projects
Deer Mountain Residential Redevelopment
New Construction, Infrastructure
Conception
SD

2023 Street Project: North Avenue/Main Street Improvements - City of Spearfish
Infrastructure
Conception
Less than $1,448,063 est. value
Spearfish, SD 57783

Signing and Delineation - Gravel Roads
Infrastructure
Design
$1,100,000 CJ est. value
Deadwood, SD 57732

Signing and Delineation - Gravel Roads
Infrastructure
Design
$1,100,000 CJ est. value
Deadwood, SD 57732

Summit at Deadwood Stage Run Addition
Infrastructure
Bidding
$500,000 CJ est. value
Deadwood, SD 57732

Summit at Deadwood Stage Run Addition
Infrastructure
Bidding
$500,000 CJ est. value
Deadwood, SD 57732

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Creekside ES Sidewalk and Mountain View ES Asphalt Improvement
Infrastructure
Post-Bid
Spearfish, SD 57783

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

2021 Chip Seal
Results
$295,607 est. value
Deadwood, SD

Manuel Brothers Park Shelter Improvement - City of Lead
Infrastructure
Pending Verification
$2,000,000 CJ est. value
Lead, SD 57754

Shoulder Widening, Modify Intersection
Infrastructure
Conception
$19,905,000 CJ est. value
Deadwood, SD 57732

Miller Street Parking Garage - City of Deadwood
New Construction, Infrastructure
Design
$2,000,000 CJ est. value
Deadwood, SD 57732

Airport Pavement Maintenance Project
Infrastructure
Post-Bid

Spearfish Sandstone Hills Street Repair and Sewer Upsize
Results
$1,455,000 to $1,569,460 est. value
Spearfish, SD 57783

Last Updated 10/28/2022 02:34 PM
Project Title

US14A - Replace Ice Box Creek Box Culvert 0.2 Miles East of Cheyenne Crossing - South Dakota Department of Transportation

Physical Address View project details and contacts
City, State (County) Deadwood, SD 57732   (Lawrence County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected June 2026
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

A more detailed scope is expected to be released on a future date. As of October 28, 2022, this project is in the conceptual phase. Information regarding a design team and the contractor selection has not been disclosed. Although a firm timeline for construction has not been determined, construction is not expected to start prior to 2026. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents