Similar Projects
New Wastewater Facility
New Construction
Design
$6,200,000 est. value
Genesee, ID

Spring Valley CID No. 1 - Waste Water Treatment Plant Phase I
Renovation, Infrastructure
Bidding
$690,000 CJ est. value
Eagle, ID 83616

Spring Valley CID No. 1 - Waste Water Treatment Plant Phase I
Renovation, Infrastructure
Bidding
$690,000 CJ est. value
Eagle, ID 83616

Lander Street Water Renewal Facility Digester Cleaning
Term Contract
Sub-Bidding
$250,000 CJ est. value
Boise, ID 83703

Six (6) Each External Sludge Mixers - Equipment Only
Term Contract
Sub-Bidding
$600,000 CJ est. value
Boise, ID 83702

2022 Concrete Replacement
Alteration
Post-Bid
Idaho Falls, ID

South Fork Coeur d Alene River Sewer District Page Wastewater Treatment Plant (WWTP) Outfall Relocation
Renovation
Post-Bid
$3,000,000 est. value
Osburn, ID

Malad City Wastewater Treatment Upgrades Phase One
Renovation
Results
Malad City, ID

WRRF Post Aeration Blower Replacement
Renovation
Results
Meridian, ID

Well 3 Elevated Water Tank Project
New Construction, Infrastructure, Renovation
Bidding
$10,000,000 CJ est. value
Ammon, ID 83401

Concrete Slab Replacement
Alteration
Post-Bid
$200,000 est. value
Idaho Falls, ID 83401

North Highland Park Concrete Improvements 2022
Alteration
Results
$141,870 est. value
Idaho City, ID

Homedale Wastewater Improvements
Renovation
Bidding
$10,000,000 CJ est. value
Homedale, ID 83628

Priest Lake Supervisory Area - Concrete Slab
Alteration
Post-Bid
$200,000 est. value
Coolin, ID 83821

Waste Water Recovery Facility (WRRF) Side Stream Phosphorus Treatment Construction
New Construction
Results
$2,000,000 est. value
Meridian, ID 83646

Last Updated 08/05/2022 11:01 PM
Project Title

City of Rigby WWTP Improvements

Physical Address View project details and contacts
City, State (County) Rigby, ID 83442   (Jefferson County)
Category(s) Sewer and Water, Single Trades
Sub-Category(s) Concrete, Sewage Treatment Plant
Contracting Method Competitive Bids
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $20,758,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of improvements to the City of Rigby wastewater treatment plant, including retaining the Nuvoda MOB system and adding the following major components: septage receiving box improvements; critical spares and lab equipment; a Nuvoda MOB redundant screen; new oxidation ditches; secondary clarifiers; tertiary filters; a new UV system; new plant water pumps; new screw press dewatering; additional emergency generator and electrical upgrades, and SCADA improvements.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents