Similar Projects
Greenways And Trails - City Of Greenville
Alteration
Conception
$1,000,000 est. value
Greenville, SC 29601

Sewer Projects: Don Avenue/Curtis Street - City of Anderson
Infrastructure
Conception
$500,000 CJ est. value
Anderson, SC 29624

Infrastructure Water Line Removal - West Market Street Roundabout - City of Anderson
Infrastructure
Design
$310,000 CJ est. value
Anderson, SC 29624

Linley Park South - Construction of 9 Mile Link - City of Anderson
Infrastructure
Design
$5,500,000 CJ est. value
Anderson, SC 29625

Redevelopment of Taxiway and Riverside Former Mill Sites
Infrastructure
Post-Bid
SC

Brushy Creek Greenway
Infrastructure
Post-Bid
$1,200,000 est. value
Easley, SC

ACTC 122 Resurfacing Project
Infrastructure
Results
Anderson, SC

A New Maintenance Building at the Career and Technology Center
New Construction, Infrastructure - 12,088 SF
Results
Williamston, SC 29697

Tiger Cove RV Park
New Construction, Infrastructure - 3,000 SF
Construction
$6,000,000 CJ est. value
Anderson, SC 29626

Tiger Cove RV Park
New Construction, Infrastructure - 3,000 SF
Construction
$6,000,000 CJ est. value
Anderson, SC 29626

Techtronic Industries Manufacturing Plant and Warehouse
Addition, Demolition, Infrastructure - 1,000,000 SF
Pending Verification
$75,000,000 CJ est. value
Anderson, SC 29621

Anderson County Energy Center
New Construction, Infrastructure
Pending Verification
$700,000,000 CJ est. value
Anderson, SC 29621

Generostee Relief Sewer - City of Anderson
Infrastructure
Conception
$19,300,000 CJ est. value
Anderson, SC 29624

D.B. Walker Phase II Park Improvements
New Construction, Infrastructure
Post-Bid
$700,000 CJ est. value
Anderson, SC 29624

Expanding Cement Services - Oklahoma
Infrastructure, Alteration
Results
Clemson, SC

Last Updated 05/08/2023 12:13 PM
Project Title

SCDMV Anderson Entrance

Physical Address View project details and contacts
City, State (County) Anderson, SC 29621   (Anderson County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

**As of May 1, 2023, project was awarded to MAR CONSTRUCTION COMPANY INC but awarded amount is not available.** The SCDMV is seeking bids from qualified contractors to demolish the employee entrance slab at the SCDMV Anderson at 331 Highway 29 Bypass North, Anderson, SC, 29621, replace it with a concrete slab on grade with the facility's interior flooring, adding steps and handrails. DESCRIPTION: Re-solicitation of 540004923 SCDMV Anderson Entrance. 1) Demolish and remove existing angled employee entrance slab, with caution not to disturb the aluminum canopy support post. 2) Construct new employee entrance. Form, add fill material, and manually compact or fill with concrete to achieve grade of facility concrete interior floor. Place 6 mil poly and welded wire in form and raise to half thickness during concrete placement. Install expansion material between existing facility slab and new concrete placement. This placement will be 6' x 6'. Vibrate edges to assure there are no voids on all concrete placements. Finish to be light broom. 3) Form and add a 4' x 4' extension to the entrance platform. This extension will face the HVAC units. Exact placement will be determined by rise of access steps from asphalt surface of "alley way." 4) Fabricate and place 1 1/2 " black iron handrails around perimeter of all constructed concrete pads and down steps. Handrails will have top rail, mid rail, and 4" toe kick as required. Ends of handrails facing "alley way" will be mushroom in design. Handrails will be primed and receive two coats of gloss black exterior paint. 5) Work may be accomplished during normal work hours. It will be necessary to work with the facility management staff to ensure access of facility personnel. Normal work hours for this facility are Monday Tuesday, Thursday and Friday from 08:30AM - 05:00PM and Wednesday from 09:30AM - 05:00PM. 6) Contractor must remove all construction material. Use of the SCDMVV's dumpster is prohibited. 7) Contractor must return the work area to the same condition it was prior to work starting. 8) Contractor will be required to repair any damage caused to the facility that is not a part of this Scope of Work at the Contractor's expense, if the damaged is not caused by an approved operation in this Scope of Work. 9) Bid bond not required.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents