Similar Projects
Mount Troy Road Extension Site 2 Slope Stabilization
Infrastructure
Bidding
Pittsburgh, PA

Chartiers Park Stream Restoration
Infrastructure
Bidding
Bridgeville, PA

Corrugated Metal Pipe
Post-Bid
Pittsburgh, PA 15123

Semicir Street Landslide Remediation
Post-Bid
Pittsburgh, PA 15214

Scott Township CD 44 7.5 Georges Run Stream Restoration
Results
Pittsburgh, PA

Carrie Furnace Redevelopment Project - Western Phase
Results
$1,300,000 to $1,500,000 est. value
Monroeville, PA 15146

Department of Public Works - Robb Hollow Parklet Phase 2
Infrastructure
Bidding
Pittsburgh, PA

Reinforced Concrete Products
Post-Bid
Monroeville, PA

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

Cowley Park Landslide Remediation
Post-Bid
Pittsburgh, PA 15219

SR 2064, Lime Hollow Road Slide
Results
$2,500,000 to $4,999,999 est. value
PA

Bairdford Park Master Plan Construction B-1 Ballfield Project
Post-Bid
$85,000 est. value
Cheswick, PA 15024

Waterworks Park Reservoir Liner and Cover Replacement
Results
$200,000 est. value
Sewickley, PA 15143

Combined Sewer Overflow Debris Control
Post-Bid
$30,000 est. value
Etna, PA 15223

Municipal Building Stormwater Pond
Results
Presto, PA 15142

Last Updated 06/22/2021 09:45 AM
Project Title

2021 Bauman Avenue Drainage Improvement Project

Physical Address View project details and contacts
City, State (County) Brentwood, Pittsburgh, PA 15227   (Allegheny County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $170,000 to $180,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Project consists of installation of a new storm sewer system and repairs in, along and adjacent to Bauman Avenue in Brentwood Borough including, but not limited to, the installation of storm sewer manholes; inlets; approximately 800 linear feet of 15” SLCPP WT JT storm sewer ranging in site clearing; unclassified bulk and trench excavation; erosion and sedimentation control measures; associated site and pavement restorations; traffic control utility coordination; and resident notifications, complete in place.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents