Similar Projects
Capital Improvement Projects
Renovation
Post-Bid
Las Vegas, NV 89121

Fire Station 1
New Construction
Post-Bid
Mesquite, NV

City Hall Improvements - PW 23-102 - City of Boulder City
Renovation
Conception
$300,000 est. value
Boulder City, NV 89005

Municipal Court Jury Box Renovation
Renovation
Results
Less than $200,000 est. value
Las Vegas, NV 89101

Elevator Upgrades
Renovation
Sub-Bidding
$560,000 CJ est. value
Henderson, NV 89015

Old City Hall/Community Center - 25032 - City of North Las Vegas
New Construction, Infrastructure
Design
$8,296,822 CJ est. value
North Las Vegas, NV 89030

Government Center - 1st, Treasurer's Office - Cash Receipt Room
Renovation
Results
$172,747 to $181,892 est. value
Las Vegas, NV 89106

Justice Facility/Municipal Court Expansion - 10581 - City of North Las Vegas
Addition, Demolition, Infrastructure
Design
$18,381,000 CJ est. value
North Las Vegas, NV 89030

Courtroom Renovations
Renovation
Results
$350,000 to $450,000 est. value
Henderson, NV

City Hall Seismic Upgrade
Renovation
Results
$7,200,000 est. value
Reno, NV 89501

Tonopah Justice Court Remodel
Renovation
Results
Tonopah, NV 89049

Elko County District Court Remodel of Old Bank Building Into Courtroom
Renovation
Results
Elko, NV 89801

Fernley Municipal Court Remodel
Renovation
Results
Fernley, NV

Last Updated 07/28/2022 01:02 PM
Project Title

Justice Facility - Front Entry Remodel Phase 2 - MF096 - City of Henderson

Physical Address View project details and contacts
City, State (County) Henderson, NV 89015   (Clark County)
Category(s) Government/Public
Sub-Category(s) Capitol/Court House/City Hall
Contracting Method Competitive Bids
Project Status Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $3,724,500 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Phase 2 will be to remodel the Justice Facility front entry by replacing solid walls with glass to provide better lines of sight for security officers at the security checkpoint and by creating a more efficient space to allow for expanded security screening operations. Also enclose the front foyer to the building by adding a second floor that could be used for additional customer windows and operations office space. The additional space on the second floor would be approximately 850 square feet. This project is included in the city's FY 2023-2028 Capital Improvement Program. As of July 28, 2022, further details regarding design and construction timelines have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

2 Stories Above Grade.
Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting Irrigation, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents