Similar Projects
The Sand Trace Phases 1, 2 and 3
New Construction, Infrastructure
Conception
$113,200,000 CJ est. value
Smithfield, RI 02917

Deerfield Park Maintenance Facility - 23-P&R-05 - Town of Smithfield
New Construction, Infrastructure
Conception
Less than $500,000 est. value
Smithfield, RI 02917

Hidden Meadows
New Construction
Design
Cumberland, RI

New Pond Park
New Construction
Design
Cumberland, RI 02864

Water Pollution Control Facility Concrete Restoration and Concrete Lining
Infrastructure
Bidding
$500,000 CJ est. value
East Providence, RI 02915

Bridge Group 14 - Rt 99 Cum, Lin
Infrastructure
Bidding
$700,000 CJ est. value
Lincoln, RI 02838

Improvements to River Island Park
Renovation
Post-Bid
$100,000 est. value
Central Falls, RI

RFP - New Facility for the Rhode Island Department of Health State Health Laboratories (RISHL) and Additional Private Laboratory Space
New Construction, Infrastructure
Post-Bid
$65,976,111 CJ est. value
Providence, RI 02904

Neutaconkanut Park Little League Field Improvements
Results
Providence, RI 02909

Pyramid Shade Structure for Veterans Memorial Park
Results
$20,000 est. value
Central Falls, RI 02863

Roger Williams Park Gateway Center
Renovation, Addition - 33,700 SF
Construction
$2,000,000 est. value
Providence, RI 02905

The Preserve at Pippin Orchard
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Cranston, RI 02921

661 Park
Demolition, New Construction, Infrastructure - 5,132 SF
Pending Verification
$27,000,000 CJ est. value
Cranston, RI 02910

Replacement of Boyle Athletic Field Complex - 23-SCH-01
Renovation
Conception
Less than $3,200,000 est. value
Smithfield, RI 02828

Community Music Works
New Construction, Infrastructure - 11,033 SF
Design
$5,000,000 CJ est. value
Providence, RI 02909

Last Updated 09/13/2022 12:20 PM
Project Title

Diamond Hill Park Improvements

Physical Address View project details and contacts
City, State (County) Cumberland, RI 02864   (Providence County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of the installation of fountain and aeration systems at Diamond Hill Pond, removal and replacement of stop logs at two existing sluiceways, installation of a trash rack at an existing flow control structure, removal of existing timber and concrete walkways, and installation of new timber and concrete walkways with steel railings. All work must be completed on or before June 30, 2023.

Details

Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents