Similar Projects
North York Widening #1 (Exit 19)
Infrastructure
Conception
$187,200,000 CJ est. value
Springfield Township, PA 17403

North York Widening #1 (Exit 19)
Infrastructure
Conception
$187,200,000 CJ est. value
Springfield Township, PA 17403

Red Lion Avenue Bridge
Infrastructure, Renovation
Design
$1,905,500 CJ est. value
Felton, PA 17322

Red Lion Avenue Bridge
Infrastructure, Renovation
Design
$1,905,500 CJ est. value
Felton, PA 17322

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

2022 Street Projects
Infrastructure
Post-Bid
Jacobus, PA 17407

74/24 Curb, Sidewalk, Storm Sewer, and Street Improvements
Infrastructure
Results
Red Lion, PA

2021 Bridge Maintenance Project
Renovation, Infrastructure
Results
$300,000 to $350,000 est. value
PA

2022 Roadway Improvements - Contract No. 1
Infrastructure
Construction
$311,998 CJ est. value
Penn Township, PA 17331

2022 Roadway Improvements - Contract No. 1
Infrastructure
Construction
$311,998 CJ est. value
Penn Township, PA 17331

Brookfield Crossing Subdivision
New Construction, Infrastructure
Pending Verification
$25,000,000 CJ est. value
Red Lion, PA 17356

Brookfield Crossing Subdivision
New Construction, Infrastructure
Pending Verification
$25,000,000 CJ est. value
Red Lion, PA 17356

Detters Mill Road Bridge
Demolition, New Construction, Infrastructure
Conception
$1,118,570 CJ est. value
Dover, PA 17315

North York Widening #2 (Codorus Creek Bridge)
Infrastructure
Design
$151,236,000 CJ est. value
Springfield Township, PA 17403

2022 Street Projects
Infrastructure
Post-Bid
Loganville, PA 17403

Last Updated 05/02/2023 01:49 PM
Project Title

Moul Road Bridge Replacement

Physical Address View project details and contacts
City, State (County) Paradise Township, PA 17364   (York County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $413,667 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Replacement of an existing pipe culvert on Moul Road over Paradise Creek with a precast concrete arch bridge, approach roadway, and guide rail A bid bond by acceptable surety or a certified check made payable to Jackson Township in the amount of 5% of the maximum bid must be provided by each bidder with their bid. Clarification Deadline: 9/21/2022 5:00 PM

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Operation and Maintenance of Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents