Similar Projects
Municipal Water Well Improvements
Infrastructure
Bidding
$1,131,320 CJ est. value
Dayton, IA 50530

Bridge Repair
Infrastructure
Bidding
$3,500,000 CJ est. value
Fort Dodge, IA 50501

Starbucks Site & Shell
Renovation - 37,055 SF
Post-Bid
Fort Dodge, IA 50501

HMA Sidewalk/Trail - Prairie River Trail
Infrastructure
Results
IA

PCC Pavement - Grade and Replace
Infrastructure
Results
IA

Iowa Travel Center
New Construction - 9,750 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Duncombe, IA 50532

Roads - City of Fort Dodge
Infrastructure
Pending Verification
$141,450 CJ est. value
Fort Dodge, IA 50501

North Central Iowa Regional Solid Waste Agency (NCIRSWA) Slope Stability Project
Infrastructure
Bidding
$5,500,000 CJ est. value
Fort Dodge, IA 50501

Fort Dodge CSI Phase 2 - 10th Avenue North
Infrastructure
Results
$3,300,000 est. value
Fort Dodge, IA 50501

Corridor Plaza - Plat 2
New Construction, Infrastructure
Pending Verification
$10,000,000 CJ est. value
Fort Dodge, IA 50501

Hma Resurfacing with Milling
Infrastructure
Results
IA

PCC Patching
Infrastructure
Results

N. 1 St Street Reconstruction
Infrastructure
Results
$2,349,925 CJ est. value
Fort Dodge, IA 50501

2022 Asphalt Street Repair
Infrastructure
Results
Fort Dodge, IA

Granular Surfacing of Roadway
Infrastructure
Results

Last Updated 10/12/2022 02:11 PM
Project Title

Poplar Avenue Traveler's Center

Physical Address View project details and contacts
City, State (County) Fort Dodge, IA 50501   (Webster County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Food/Beverage Service, Gas Station, Paving/Reconstruction, Retail, Site Development, Vehicle Sales/Service
Contracting Method Bids by Invitation
Project Status Abandoned, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $6,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of a new traveler's center with a convenience store, restaurant, and gas station. Further scope has not been released. As of October 2022, the project will not be moving forward. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

10,000 SF.
Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete, Concrete Finishing.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Telephone Specialties, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Metal Storage Shelving.
Division 11 - Equipment, Vehicle Service Equipment, Vehicle-Washing Equipment, Loading Dock Equipment, Refrigerated Display Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Cooking Equipment, Food Dispensing Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Casework, Countertops, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Office Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Screening Devices, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 44 - Pollution and Waste Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents