Similar Projects
Wolfs Crossing Road Reconstruction -Segment 2 - Douglas - Village of Oswego
Infrastructure
Conception
$5,201,300 est. value
Oswego, IL 60543

Milling and Resurfacing (Designed Overlay) and ADA
Infrastructure
Bidding
$4,000,000 est. value
Plano, IL 60545

Village Hall Parking Lot and Sidewalk Improvements
Post-Bid
Oswego, IL

Adams Street to Main Street Pathway Replacement
Post-Bid
Oswego, IL 60543

2021 Grove Road Trail ADA Improvements
Results
Oswego, IL 60543

Parking Lot Repaving
Results
Less than $43,064 est. value
Bristol, IL

Proposed Site Improvements
Infrastructure, Alteration
Post-Bid
Yorkville, IL

Parking Lots Repaving
Results
Less than $95,150 est. value
Oswego, IL

2021 Sidewalk
Infrastructure
Post-Bid
Plano, IL

2021 Sidewalk/Curb Replacement
Infrastructure
Results
Joliet, IL

Snow Must Be Plowed From the Parking Lot and Approach Ramps
Term Contract, Infrastructure
Post-Bid
Joliet, IL

Removing and Replacing Concrete Sidewalks, and Repairing Undermined Sidewalks with Non-Shrink Grout
Infrastructure
Results
IL

Sidewalk and Curb Maintenance Program
Infrastructure
Post-Bid
$543,000 est. value
Oswego, IL

2022 Municipal Parking Lot Improvements (7196 Caton Farm Road / 1 South Des Plaines Street)
Infrastructure
Results
$100,000 est. value
Joliet, Plainfield, IL 60586

Prairie Pointe Parking Lot Improvements
Infrastructure
Post-Bid
$225,000 est. value
Yorkville, IL 60560

Reported 06/15/2022 10:02 AM
Project Title

Venue 1012 Parking Lot Maintenance - Village of Oswego

Physical Address View project details and contacts
City, State (County) Oswego, IL   (Kendall County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected January 2024
Bids Due View project details and contacts
Estimated Value $320,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work and paving for a sidewalk / parking lot in Oswego, Illinois. Conceptual plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot. The parking lot was constructed in 2003. Maintenance costs assume seal coating approximately every 3 years and mill and overlay every 20 years, with occasional concrete and asphalt repairs as required. The lot measures approximately 18,000 SY. The lot will be resurfaced in FY'23 and sealed in FY'26. This project is in included in the Village of Oswego FY 2023-2027 Capital Improvement Plan (CIP). As of June 14, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents