Similar Projects
RFP Design - High School Gymnasium HVAC Project
Renovation
Bidding
$2,000,000 CJ est. value
Redlands, CA 92374

Library HVAC Replacement
Renovation
Sub-Bidding
$250,000 CJ est. value
Chino Hills, CA 91709

HVAC Upgrade at Silverado High School
Alteration
Post-Bid
Victorville, CA 92395

Heating Ventilation and Air Conditioning Services
Alteration
Post-Bid
CA

District Wide HVAC Replacements 11 Campuses (COVID) - HVAC
Alteration
Results
$13,500,000 est. value
Hesperia, CA 92344

HVAC Repair Services in Riverside and San Bernardino Counties
Term Contract
Results

Career Training Center (CTC) Building 200 HVAC Removal and Replacement
Alteration
Post-Bid
Ontario, CA 91762

Preventive Maintenance of HVAC, Exhaust fans, Chillers, Cooling Towers
Term Contract
Results
Loma Linda, CA 92357

Cooling Tower Motor Replacement
Infrastructure
Post-Bid
Loma Linda, CA 92357

AVUSD: HVAC Replacement at Five Various Sites - Phase 2 Project
Alteration
Results
$500,000 est. value
Apple Valley, CA

HVAC Maintenance
Term Contract
Post-Bid
Nipton, CA 92364

California Institution for Men Air Cooling, Facility A
Renovation
Results
$11,108,918 CJ est. value
Chino, CA 91710

Grace Yokley Middle School Locker Room HVAC Addition
Alteration
Post-Bid
$200,000 est. value
Ontario, CA 91761

Alta Loma High School Central Plant Chiller Replacement
Renovation
Results
$936,237 CJ est. value
Rancho Cucamonga, CA 91701

Recreation Center HVAC
Alteration
Post-Bid
Needles, CA 92363

Last Updated 04/13/2023 10:56 AM
Project Title

HVAC System Replacement

Physical Address View project details and contacts
City, State (County) Barstow, CA 92311   (San Bernardino County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Contractor shall furnish all labor, materials, equipment, tools, and utility and transportation services, and perform and complete all work required in connection with Bid # 23-006(Project) in strict accordance with the Contract Documents enumerated in Article 7 below. The Contractor shall be liable to the District for any damages arising as a result of a failure to comply with that obligation, and the Contractor shall not be excused with respect to any failure to so comply by an act or omission of the Architect, Engineer, Inspector, Division of the State Architect (DSA), or representative of any of them, unless such act or omission actually prevents the Contractor from fully complying with the Contract Documents and the Contractor protests, in accordance with the Contract Documents, that the act or omission is preventing the Contractor from fully complying with the Contract Documents. Such protest shall not be effective unless reduced to writing and filed with the District office within seven (7) days of the date of occurrence of such act or omission preventing the Contractor from fully complying with the Contract Documents. The Barstow Unified School District hereinafter referred to as the "District" will accept bids for HVAC System Replacement. All bidders must complete and qualify the BUSD CUPCCAA application electronically. For questions, contact the Facilities and Maintenance Director via email address: james_hochstedler@busdk12 .com

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents