Similar Projects
Goodview Avenue Water Main Extension
Infrastructure
Bidding
Cottage Grove, MN 55016

Old Village Phase 5 And 6 Street, Drainage and Utility Improvements
Results
MN

Phase 4 East - Historic District Improvements
Results
$1,800,000 est. value
Mahtomedi, MN

Hamlet on Sunfish Lake Street and Utility Improvements
Results
Lake Elmo, MN

Hudson Road and Settlers Ridge Parkway Roadway and Intersection Improvements
Results
$3,000,000 est. value
Woodbury, MN 55125

Summers Landing 5th Addition Utility, Street Lighting Improvements
Results
Cottage Grove, MN

Lift Station 11 Improvements
Renovation
Results
Less than $553,000 est. value
Oakdale, MN

38th-39th Street Neighborhood Street & Utility Improvements
Results
$2,271,000 est. value
Lake Elmo, MN

2021 Downtown Improvement Project/Lions Park
New Construction, Infrastructure
Results
Hugo, MN 55038

Park Estates Water Meter Vault
Infrastructure
Results
$138,500 est. value
Saint Paul Park, MN 55071

121st Street and Acres of Bald Eagle Utility and Street Improvements Project
Infrastructure
Results
Hugo, MN

Edith Pond Stormwater Lift Station
New Construction
Results
Mahtomedi, MN

Torre Pines Street and Utility Improvements
Infrastructure
Results
$1,210,000 est. value
Lake Elmo, MN

Whistling Valley Street and Utiltiy Improvements
Infrastructure
Results
Stillwater, MN

2022 Booster Pumping Station Improvements
Renovation
Results
Bayport, MN

Last Updated 03/04/2022 05:48 AM
Project Title

2022-2023 Lift Station and Forcemain Improvements

Physical Address View project details and contacts
City, State (County) Forest Lake, MN   (Washington County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

A. For two (2) lift stations, complete station replacement. B. For four (4) lift stations, station replacement with reuse of existing wet well. C. For six (6) lift stations, addition of a bypass pipe to the valve vault and/or other miscellaneous work. D. For three (3) lift stations, replacement of the existing station with a prefabricated grinder station and new small-diameter forcemain and coating of the discharge manhole. E. For one (1) lift station, replacement of existing forcemain and coating of the discharge manhole. F. At two (2) lift stations, addition of a permanent backup generator. Alternate items of work have been included for the following: A. For one (1) lift station, station replacement with reuse of existing wet well.

Details

Lift and Pump Stations, Renovation.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents