Similar Projects
Comfort Inn Hotel
New Construction, Addition - 10,506 SF
Conception
Ocean City, MD 21842

Collective at Canton
New Construction - 90,800 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Baltimore, MD 21224

Caroline County Family YMCA
New Construction - 35,000 SF
Design
$12,000,000 est. value
Denton, MD 21629

Athena Plaza
New Construction - 4,950 SF
Design
Berlin, MD 21811

Restroom Facility Construction
New Construction - 860 SF
Bidding
Less than $500,000 CJ est. value
Dunkirk, MD 20754

Pool Filter and Feature Pumps at Edward T. Hall Aquatic Center
Post-Bid
Prince Frederick, MD 20678

The Edge At Middelton
New Construction
Post-Bid
Aberdeen, MD 21001

Restroom Upgrades
Results
Frederick, MD 21701

Roger Carter Pool Chemical Room Renovations
Renovation
Results
$100,001 to $500,000 est. value
MD

Harbor East Residential Tower
New Construction
Construction
$100,000,000 est. value
Baltimore, MD 21202

Holiday Inn Express
New Construction, Demolition - 57,000 SF
Construction
White Marsh, MD 21162

Victorian Oaks Manor
New Construction
Pending Verification
Berlin, MD

Oxon Hill Hotel
New Construction, Renovation - 54,600 SF
Pending Verification
Oxon Hill, MD 20745

Herring Way Duplexes
New Construction
Conception
Ocean City, MD 21842

Lakeside At Trappe Master Plan
New Construction
Design
Trappe, MD

Last Updated 10/14/2021 01:23 PM
Project Title

Renovation of the Municipal Pool Design-Build

Physical Address View project details and contacts
City, State (County) Westminster, MD 21158   (Carroll County)
Category(s) Entertainment/Recreation
Sub-Category(s) Restroom/Bath House, Swimming Pool(s)
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of this project consists of design and construction of the City Municipal Pool Renovation and must include: A. Civil, Architectural, Structural, Mechanical, Electrical, and HVAC design of the new Main Pool, Public Restrooms, Filter Room, Splash Pad, and Lap Learning Pool Structures. B. All necessary permits for the Project Constructions from Regulatory Agencies; and, C. Construction of the new Main Pool, construction of Public Restrooms and Filter Room.

Details

4 Restroom/Bath House, 110 to 440 SF New Construction, Buildings.
Division 02 - Existing Conditions, Demolition.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Concrete Finishing.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 09 - Finishes, Painting, Special Coatings, Cementitious Coatings.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories.
Division 13 - Special Construction, Swimming Pools, Recirculating Gutter Systems, Swimming Pool Accessories, Swimming Pool Cleaning Equipment.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Pool and Fountain Plumbing Systems, Swimming Pool Plumbing Systems.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Special Purpose Lighting, Underwater Lighting, Exterior Lighting.
Division 31 - Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents